...The Regional Municipality of Waterloo mandated GrandLinq G.P. (ProjectCo) to design, build, finance, operate, and maintain a 19-kilometer light rail transit (LRT) route from the Conestoga Mall in the City of Waterloo, Ont., to Fairview Park mall in the City of Kitchener, Ont., with 16 at-grade stops. The light rail vehicles (LRV) delivery is outside of the project's scope, and the region entered a separate LRV delivery contract with Bombardier Inc. Construction started in August 2014 and the original scheduled substantial completion (SC) target date was July 28, 2017. The SC has been delayed multiple times due to vehicle delivery problems. The current SC date is May 31, 2019, but it will likely change again. Peter Kiewit Infrastructure Co. (performance guaranteed by parent Kiewit Infrastructure Group Inc.) and Aecon Construction and Materials Ltd. are joint and several members of the design-build joint venture (DBJV). Keolis Grand River L.P. (with a performance guarantee from Keolis SA),...