Abstract:

Synopsis

'NTPC/BPIC Lakhisarai Coal-Based Thermal Power Plant 1320 MW Bihar - Project Profile' contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The 'NTPC/BPIC Lakhisarai Coal-Based Thermal Power Plant 1320 MW Bihar - Project Profile' is part of World Market Intelligence's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary

A joint venture of National Thermal Power Corporation Ltd (NTPC) and Bihar Power Infrastructure Co. Pvt Ltd (BPIC), through a project proponent lead, Lakhisarai Bijlee Company Pvt. Ltd (LBCPL), is planning to undertake the coal-based thermal power plant project in Bihar, India.

The project involves the construction of a 1,320MW coal-based thermal power plant with two units of 660MW each.

It includes the construction of a coal washing unit, water transmission pipelines, raw water storage tanks, switchyard for power evacuation and a powerhouse, the installation of turbines and generators, and the laying of transmission lines.

The plant will utilize 6.25MMTPA coal and 100 cusecs water from River Ganga to generate 1,320MW of power.

The Bihar Government offered the requisite land, water and other such infrastructure for the project. Fitchner Consulting Engineers has been appointed to prepare the detail project report (DPR).

Sutlej Jal Vidyut Nigam Limited (SJVNL) has registered their interest in the proposed project.

In August 2011, NTPC released tender for Build Own Operate (BOO) contract with submission deadline December 14, 2011. However, no bidder has shown their interest in the proposed project due to lack of coal linkage approval.

On February 22, 2014, a memorandum of understanding (MoU) was signed among Bihar State Power Holding Company Ltd (BSPHCL) and NTPC to take over LBCPL, a subsidiary of BSPHCL, by contributing 74% of the share of investment for setting up the project.

IL&FS Energy Development Company has been appointed as the lead consultant.

On February 22, 2016, MoU was expired.

As of May 2016, the central government was willing to sign MoU again with NTPC.

The project is moving at the slow pace, due to the delays in allocation of coal blocks by the central government.

Scope

The project involves the construction of a 1,320MW coal-based power plant at Kajra village in Lakhisarai district of Bihar, India.

The US$1,485 million project includes the following:

1. Construction of 660MW power plant under Unit I
2. Construction of 660MW power plant under Unit II
3. Construction of coal washing unit
4. Construction of water transmission pipelines
5. Construction of raw water storage tanks
6. Construction of switchyard for power evacuation
7. Construction of powerhouse
8. Installation of turbines and generators
9. Laying of transmission lines

ReasonsToBuy

Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.

  
Source:
Document ID
CIC130467PP
Country
Industry
Format:
PDF Adobe Acrobat
Buy Now

World Market Intelligence—Premium analytical reports based on a combination of market data, company, deals and project content, industry surveys and additional primary and secondary research.

About the Author


Cite this Report

  
MLA:
World Market Intelligence. "NTPC/BPIC Lakhisarai Coal-Based Thermal Power Plant 1320 MW Bihar - Project Profile" Jul 31, 2017. Alacra Store. Nov 17, 2026. <http://www.alacrastore.com/storecontent/World-Market-Intelligence/NTPC-BPIC-Lakhisarai-Coal-Based-Thermal-Power-Plant-1320-MW-Bihar-Project-Profile-2119-62305>
  
APA:
World Market Intelligence. (2017). NTPC/BPIC Lakhisarai Coal-Based Thermal Power Plant 1320 MW Bihar - Project Profile Jul 31, 2017. New York, NY: Alacra Store. Retrieved Nov 17, 2026 from <http://www.alacrastore.com/storecontent/World-Market-Intelligence/NTPC-BPIC-Lakhisarai-Coal-Based-Thermal-Power-Plant-1320-MW-Bihar-Project-Profile-2119-62305>
  
US$ 75.00
$  £  €
Have a Question?

Any questions about the report you're considering? Our Customer Service Team can help! Or visit our FAQs.

More Research

Search all our Market Research from one place.