Abstract:

Summary

The report contains a detailed description of the power generation companys business operations, history, corporate strategy, and business structure. This report contains a detailed SWOT analysis, information on key employees (executives), and major products and services.

Scope

- Major Power Plants (assets) - summarized and detailed information about the power plants (assets).
- Operational Metrics (capacity, generation, revenue, sales, number of consumers).
- Business description - A detailed description of the companys operations and business divisions.
- Corporate strategy - GlobalDatas summarization of the companys business strategy.
- SWOT analysis - A detailed analysis of the companys strengths, weakness, opportunities and threats.
- Company history - Progression of key events associated with the company.
- Major products and services - A list of major products, services and brands
- Key employees - A list of the key executives and personnel heading key departments/functions.
- Executive biographies - A brief summary of the executives employment history.
- Financial deals - Coverage of key financial deals from 2006 onwards, depending upon information availability
- Important locations and subsidiaries - A list of key locations and subsidiaries of the company, including contact details.

* Note: Some sections may be missing if data is unavailable for the company.

Reasons to buy

- Gain key insights into the company for academic or business research purposes. Key elements such as SWOT analysis, corporate strategy and major products and services are incorporated in the profile to assist in various business decisions (M&A and JV).
- Identify potential customers and suppliers with this reports analysis of the companys business structure, operations, major products and services and business strategy.
- Understand and respond to competitors business structure and strategies with GlobalDatas detailed SWOT analysis. In this, the companys core strengths, weaknesses, opportunities and threats are analyzed, providing an up to date objective view of the company.

  
Source:
Document ID
GDPE11630CDB
Industry
Format:
PDF Adobe Acrobat
Buy Now

Sections

TitleStarting PageNumber of Pages
Table of Contents29
  List of Tables101
Company Snapshot111
  Key Information111
  Company Overview111
  SWOT Snapshot111
Operational Metrics123
  The Kansai Electric Power Company, Inc., Operational Metrics, By Capacity121
  The Kansai Electric Power Company, Inc., Operational Metrics, By Generation121
  The Kansai Electric Power Company, Inc., Operational Metrics, By Transmission121
  The Kansai Electric Power Company, Inc., Operational Metrics, By Distribution121
  The Kansai Electric Power Company, Inc., Operational Metrics, By Customers131
  The Kansai Electric Power Company, Inc., Operational Metrics, By Segmental Information131
  The Kansai Electric Power Company, Inc., Operational Metrics, By Sales141
The Kansai Electric Power Company, Inc., Wind Farms151
  The Kansai Electric Power Company, Inc., Wind Farms, Japan151
The Kansai Electric Power Company, Inc., Solar PV Parks163
  The Kansai Electric Power Company, Inc., Solar PV Parks, Japan163
The Kansai Electric Power Company, Inc., Hydro Power Plants196
  The Kansai Electric Power Company, Inc., Hydro Power Plants, Japan196
The Kansai Electric Power Company, Inc., Thermal Power Plants252
  The Kansai Electric Power Company, Inc., Thermal Power Plants, Indonesia252
Business Description271
  Business Overview271
Major Products and Services272
History294
SWOT Analysis333
  Overview331
  The Kansai Electric Power Company, Inc. Strengths331
    Business Model: Integrated Structure331
    Strong Foothold: Energy Market331
    Research and Development Activities331
  The Kansai Electric Power Company, Inc. Weaknesses341
    Working Capital Deficit341
    Substantial Debt341
  The Kansai Electric Power Company, Inc. Opportunities341
    Positive Outlook For Hydropower: Japan341
    Positive Outlook For Thermal Power: Japan341
    Strategic Initiatives341
  The Kansai Electric Power Company, Inc. Threats351
    Regulatory Norms351
    Seasonal Variations and Climate Conditions351
    Transmission and Distribution Network Security351
Financial Ratios - Capital Market Ratios361
Financial Ratios - Annual Ratios371
Financial Ratios - Interim Ratios381
Key Employees391
Company Statement401
Locations And Subsidiaries412
  Head Office411
  Other Locations &Subsidiaries412
Financial Deals Landscape431
  The Kansai Electric Power Company, Inc., Deals Summary431
The Kansai Electric Power Company, Inc., Power, Deal Details446
  Asset Transactions441
    Kansai Electric Power Acquires Liquefied Natural Gas-Fired Power Plant in Kanto Region, Japan from Electric Power Development and Mitsui Engineering &Shipbuilding441
    Sumitomo, Sumitomo Australia And Kansai Electric Acquire Bluewaters Power Project From Griffin Energy In Australia451
  Partnerships461
    Japanese Companies Form Joint Venture463
  Equity Offering491
    Japan Nuclear Fuel Announces Private Placement Of US$867.2 Million491
Recent Developments5061
  The Kansai Electric Power Company, Inc. - Recent Developments501
    Oct 15, 2013: Mongolia shortlists final bidders for Tavan Tolgoi power plant501
    Feb 17, 2011: Jordan To Issue Requests For Proposals For Selection Of Reactor Operator501
    Jul 27, 2016: Joint implementation of a feasibility study of the offshore wind farm project at Akita Port and Noshiro Port in Akita Prefecture501
    Apr 22, 2016: Cooperation between Electric Power Companies in Nuclear Power Operation501
    Jan 25, 2016: Kansai Electric and Shiga prefecture ink safety accord for Takahama nuclear power plant511
    May 28, 2015: BP And Kansai Electric Sign LNG Sale And Purchase Agreement And Cooperation Agreements511
    May 07, 2014: Kansai Electric signs agreement with Iberdrola to share information on nuclear reactor operations511
    Nov 27, 2011: Kansai Electric Plans To Construct Two 500kW Solar Power Plants In Fukui Prefecture, Japan511
    Nov 17, 2010: Kansai Electric, EDF Sign Nuclear Cooperation Agreement521
    Jul 21, 2010: Toshiba Evinces Interest In Reviving Bataan Nuclear Power Plant521
    Jul 06, 2010: Japanese Consortium Establishes New Office For International Nuclear Energy Development of Japan521
    Jan 30, 2009: Kansai To Build 24 MW Wind Farm In Japan521
    Jun 23, 2008: Kansai Electric, Sharp Announce Mega Solar Power Generation Plan In Sakai City Waterfront531
    Feb 15, 2008: Kansai Electric Power Plans To Build Solar Power Plant In Osaka531
    Dec 26, 2007: Kansai Electric, Kazatomprom Sign MoU To Outsource Uranium Processing For Nuclear Power Plants531
    May 23, 2011: Woodside Energy Discovers Gas At Xeres-1 Well At WA-34-L License In Carnarvon Basin, Western Australia531
    Apr 30, 2012: Woodside Petroleum Begins Production From Pluto LNG Project In Western Australia531
    Feb 25, 2016: United Tractors Recorded Consolidated Net Revenue of Rp 49.3 Trillion for 2015541
    Apr 30, 2013: Kansai Electric Reports Revenue Of JPY2.9 Trillion In Fiscal 2013551
    Jan 31, 2013: Kansai Electric Reports Revenue Of JPY2.1 Trillion For Nine Months Of December 31, 2012551
    Oct 29, 2012: Kansai Electric Reports Revenue Of JPY1.4 Trillion In H1 Fiscal 2013551
    Jul 30, 2012: Kansai Electric Reports Revenue Of JPY648.3 Billion In Q1 Fiscal 2013551
    Apr 27, 2012: Kansai Electric Reports Revenue Of JPY2.8 Trillion In Fiscal 2012551
    Jan 31, 2012: Kansai Electric Reports Revenue Of JPY2 Trillion For Nine Months Of Fiscal 2012551
    Oct 31, 2011: Kansai Electric Reports Revenue Of JPY1.4 Trillion In H1 Fiscal 2012551
    Jul 28, 2011: Kansai Electric Reports Operating Revenues Of JPY647.4 Billion In Q1 Fiscal Year Ended 2012561
    Apr 27, 2011: Kansai Electric Reports Operating Revenues Of JPY2.8 Trillion In Fiscal Year Ended 2011561
    Jan 31, 2011: Kansai Electric Reports Nine Months Fiscal 2011 Results561
    Oct 28, 2010: KEPCO Reports Net Income Of JPY77.34 Billion For H1 Fiscal 2011561
    Jul 29, 2010: Kansai Electric Reports Operating Revenues Of JPY618.51 Billion In Q1 Fiscal 2011561
    Apr 28, 2010: Kansai Electric Reports Net Income Of JPY127.2 Billion In Fiscal 2010561
    Jan 29, 2010: Kansai Electric Reports Operating Revenues Of JPY1.89 Trillion In Nine Months Period Of Fiscal 2010561
    Oct 30, 2009: Kansai Electric Reports Operating Revenues Of JPY1.29 Trillion In H1 Of Fiscal 2010561
    Jul 30, 2009: Kansai Electric Reports Operating Revenues Of JPY608.14 Billion In Q1 Fiscal 2010561
    Jan 30, 2009: Kansai Electric Reports Nine Months Fiscal 2009 Results571
    Oct 31, 2008: Kansai Electric Reports H1 Fiscal 2009 Results571
    Jul 31, 2008: Kansai Electric Reports 1Q Fiscal 2009 Results571
    Apr 30, 2008: Kansai Electric Reports Fiscal 2008 Results571
    Jan 30, 2008: Kansai Electric Reports Nine Months Fiscal 2008 Results571
    Oct 30, 2007: Kansai Electric Reports H1 Fiscal 2008 Results571
    Jul 31, 2007: Kansai Electric Reports Q1 Fiscal 2008 Results571
    Apr 27, 2007: Kansai Electric Reports Fiscal 2007 Results571
    Jan 30, 2007: Kansai Electric Reports Nine Months Fiscal 2007 Results571
    Oct 05, 2016: Kansai Electric s Mihama 3 nuclear unit secures 20 year extension581
    Aug 17, 2016: Kansai Electric begins fuel removal at Takahama No. 4 nuclear reactor in Fukui Prefecture581
    Aug 03, 2016: NRA grants safety approval for Mihama 3 nuclear power reactor in Fukui Prefecture, Japan581
    Jul 12, 2016: For re-submission of the amendment of the Takahama Nuclear Power Plant Units 3 and 4 of the specific serious accident such as deal facility on the reactor installation change permit application581
    Jul 12, 2016: Japanese court rules against restart of Takahama nuclear reactors591
    Jul 01, 2016: BP Announces Final Investment Decision To Expand Indonesia s Tangguh LNG Facility591
    Jun 30, 2016: Australia Pacific LNG Commences Exports To Kansai Electric601
    Jun 20, 2016: Kansai Electric gets approval to extend life of two reactors at Takahama nuclear facility601
    Jun 17, 2016: Japanese court uphelds injuction on restart of Takahama nuclear power reactors601
    Apr 19, 2016: Kansai Electric s Units 1 and 2 at Takahama nuclear plant obtain safety approval601
    Apr 19, 2016: Japan Asia Group completes Hubei solar way power plant in Shiga prefecture611
    Apr 01, 2016: Toshiba's first adjustable-speed power generation system for small hydro has started commercial operation611
    Mar 14, 2016: Appeal of an Objection to the Provisional Disposition to Suspend Operation of Takahama Units 3 and 4611
    Mar 10, 2016: Kansai Electric Power: Shutdown of Takahama Unit 3611
    Mar 09, 2016: Shutdown of Takahama Unit 3611
    Mar 09, 2016: Decision of a provisional disposition preventing the operation of Units 3 and 4 of Takahama Nuclear Power Station: The Kansai Electric Power621
    Mar 09, 2016: Submission of a Report on Failure/Event of the Nuclear Installation for Takahama Unit 4622
    Feb 29, 2016: Kansai Electric's Takahama 4 nuclear power unit shuts down automatically641
    Feb 26, 2016: Announcement of Return to Commercial Operation of Takahama Unit 3641
    Feb 26, 2016: Startup of Takahama Unit 4: The Kansai Electric Power641
    Feb 24, 2016: Kansai Electric obtains approval to extend operational life of Takahama 1 and 2 nuclear reactors in Japan651
    Feb 23, 2016: Heerema Marine Contractors Announces Infield Flowlines Scope Ichthys Project Completed651
    Feb 22, 2016: Causes of and Corrective Action against Water Leakage within the Controlled Area at Takahama Unit 4661
    Feb 22, 2016: Kansai Electric's Unit 4 at Takahama nuclear plant to resume operations671
    Feb 20, 2016: Water Leakage within the Controlled Area at Takahama Unit 4: The Kansai Electric Power Company671
    Feb 12, 2016: JAPC and Kansai Electric plans to decommission three nuclear reactors in Japan681
    Jan 29, 2016: Kansai Electric restarts Takahama 3 nuclear unit in Japan681
    Jan 28, 2016: Schedule of Takahama Unit No. 3 Reactor Startup and Power Control Operation681
    Dec 29, 2015: Kansai Electric Power completes fuel loading at Takahama 3 nuclear unit681
    Dec 24, 2015: Order on objection to the decision of a provisional disposition preventing the operation of Units 3 and 4 of Takahama Nuclear Power Station681
    Dec 24, 2015: Fukui District Court overturns injunction against Takahama reactor restarts691
    Dec 22, 2015: Fukui governor approves restart of Takahama nuclear reactor restarts691
    Dec 03, 2015: Mayor approves to restart Kansai Electric s nuclear reactors in Takahama, Japan691
    Nov 26, 2015: Application for Permission to Extend the Operating Period and Application for Approval of Construction Plans of Unit 3 at Mihama Nuclear Power Station691
    Nov 10, 2015: Mitsui: Newbuilding LNG Carrier For Kansai Electric Power Named LNG JUROJIN701
    Nov 05, 2015: INPEX-Operated Ichthys LNG Project Completes Offshore Pipelay711
    Oct 09, 2015: Completion of the 3-step conformity review on the New Regulatory Requirements for Takahama NPS Units 3 and 4711
    Aug 13, 2015: Kansai Electric to evaluate solar energy generation through satellites711
    Jul 28, 2015: Newbuilding LNG Carrier For Kansai Electric Power Named LNG Fukurokuju721
    Jun 16, 2015: Operation of the 4th low-level radioactive waste transport this fiscal year721
    May 27, 2015: Operation of the 3rd low-level radioactive waste transport this fiscal year721
    May 19, 2015: Fukui District Court discards Kansai Electric s appeal of nuclear ruling721
    May 12, 2015: KEPCO: Measures to mitigate electricity rates721
    May 09, 2015: For automatic stop due to the vibration of the Himeji No. 2 Power Station Unit 3 steam turbine731
    Apr 30, 2015: Kansai Electric files application to extend operating life of two reactors at Takahama NPP731
    Apr 24, 2015: Operation of the 1st low-level radioactive waste transport this fiscal year731
    Apr 14, 2015: Japanese Court blocks restart of two Takahama nuclear reactors731
    Apr 09, 2015: Kansai Electric secures 10-year life extension for Takahama 2 nuclear unit in Japan741
    Apr 02, 2015: NRA begins review of Kansai Electric s three nuclear reactors in Japan741
    Mar 17, 2015: Kansai Electric to decommission two reactor units at Mihama NPP in Japan741
    Feb 12, 2015: NRA issues safety clearance for Takahama 3 and 4 nuclear reactors751
    Feb 05, 2015: Kansai Electric submits revised work plans for two Takahama nuclear power units751
    Jan 07, 2015: Kansai Electric set to ink safety agreements with local governments751
    Dec 25, 2014: Japanese utilities expects to decide whether to decommission five nuclear reactors751
    Dec 17, 2014: NRA approves restart of Takahama nuclear reactors761
    Dec 13, 2014: NRA to submit draft report on Takahama NPP safety measures761
    Dec 01, 2014: Kansai Electric begins special inspection at Takahama nuclear reactors761
    Nov 13, 2014: Kansai Electric may seek to extend operating life of two units at Takahama NPP761
    Aug 28, 2014: Japan Nuclear Fuel: Operation of the 1st spent fuel transport this fiscal year771
    Jun 11, 2014: Japan Nuclear Fuel: Operation of the 3rd low-level radioactive waste transport this fiscal year771
    Jun 05, 2014: First M501J Gas Turbine for Commercial-use Tops 8,000 Hours in Service At Kansai Electric Power's Himeji No.2 Power Station771
    May 27, 2014: Kansai Electric likely to restart reactors at Oi nuclear plant771
    May 21, 2014: Kansai Electric s plans to restart Ohi nuclear reactors blocked by court781
    May 21, 2014: Japan Nuclear Fuel: Operation of the 2nd low-level radioactive waste transport this fiscal year781
    May 10, 2014: Kansai Electric to increase earthquake force estimate for Oi nuclear power plant781
    May 02, 2014: Japan Nuclear Fuel: Operation of the 1st low-level radioactive waste transport this fiscal year781
    Apr 23, 2014: The status of the compliance examination of our nuclear power plants to New Regulatory Standards781
    Mar 05, 2014: Kansai Electric reports minor fire at Takahama 3 nuclear reactor in Japan791
    Oct 17, 2013: Kansai Electric closes Maizuru coal-fired power plant in Japan due to typhoon791
    Sep 15, 2013: Kansai Electric To Disconnect Unit 4 At Ohi Nuclear Power Plant From Grid791
    Sep 02, 2013: NRA Says No Fault Line Beneath Ohi Nuclear Power Station In Japan791
    Sep 02, 2013: Kansai Electric Shuts Unit 3 At Ohi Nuclear Power Plant In Japan791
    Aug 13, 2013: Kansai Electric To Shut Units 3 And 4 Of Ohi Nuclear Power Plant In September 2013801
    Jun 26, 2013: Areva Announces Arrival Of MOX Shipment From France To Japan801
    Jun 16, 2013: NRA Begins On-site Inspection Of Units 3 And 4 At Ohi Nuclear Power Plant801
    Apr 27, 2013: Kansai Electric Likely To Seek Permit For Restart Of Units 3 And 4 At Takahama Nuclear Power Plant801
    Apr 24, 2013: JNFL Announces Receipt Of LLRW From Takahama Nuclear Power Station In Japan801
    Apr 23, 2013: Dominion CEO Makes Case For US LNG Exports801
    Apr 19, 2013: NRA To Check Units 3 And 4 At Oi Nuclear Power Plant In Fukui Prefecture, Japan811
    Apr 16, 2013: Japanese Court Rejects Petition To Close Two Reactors At Ohi Nuclear Nuclear Power Plant In Japan811
    Apr 02, 2013: Kansai Electric Receives Approval To Increase Electricity Rates811
    Apr 01, 2013: Dominion Moves Forward With Liquefaction Project811
    Mar 27, 2013: Kansai Electric To Load MOX Fuel At Takahama Nuclear Power Plant In 2014821
    Mar 20, 2013: NRA Allows Kansai Electric To Continue Operations Of Oi Nuclear Power Plant Until September 2013831
    Mar 09, 2013: JAPC To Receive Financial Assistance Of JPY140 Billion831
    Jan 25, 2013: Kansai Electric To Invest JPY285 Billion To Increase Nuclear Safety831
    Dec 28, 2012: NRA Begins Second Fault Survey At Ohi Nuclear Power Plant In Japan831
    Dec 20, 2012: Kansai Electric Begins Commercial Operations At 12 MW Wind Farm In Japan831
    Dec 05, 2012: Japan To Receive Radioactive Waste From UK By February 2014831
    Nov 26, 2012: JNFL Announces Receipt Of Spent Fuel Assemblies From Three Nuclear Power Stations831
    Nov 25, 2012: Kansai Electric Seeks Approval For Hike In Residential And Commercial Electricity Prices841
    Nov 22, 2012: Kansai Electric To Restart Two Reactors At Takahama Nuclear Power Station841
    Nov 20, 2012: Kansai Electric To Purchase LNG From BP Singapore For 15 Years841
    Oct 31, 2012: KEPCO Finds No Active Fault Under Ohi Nuclear Plant In Japan841
    Oct 29, 2012: Kansai Electric Considers Power Tariff Hike841
    Oct 15, 2012: JNFL Provides Update On Receipt Of Low-level Radioactive Wastes From Two Nuclear Power Stations In Japan841
    Sep 20, 2012: Kansai Electric Restarts Oil-fired Unit 2 At Kainan Power Plant851
    Sep 18, 2012: Chubu Electric Suspends Power Generation At Unit 3 Of Atsumi Oil-fired Power Plant851
    Sep 05, 2012: Kansai Electric Closes Oil-fired Unit 2 At Kainan Power Plant851
    Aug 24, 2012: NISA Directs Additional Inspection At Mihama And Monju Nuclear Power Plants851
    Jul 26, 2012: KEPCO Intends To Restart Two Reactors At Takahama Nuclear Power Plant851
    Jul 21, 2012: KEPCO Resumes Power Generation At Unit 4 Of Ohi Nuclear Power Plant In Japan851
    Jul 19, 2012: KEPCO Restarts Unit 4 At Ohi Nuclear Power Plant In Japan851
    Jul 12, 2012: KEPCO Plans To Restart Unit 4 At Ohi Nuclear Power Plant In Japan851
    Jul 08, 2012: KEPCO's Unit 3 At Ohi Nuclear Power Plant Reaches Full Capacity851
    Jul 04, 2012: NISA To Urge Reassessment Of Fault Lines Near Fukui Nuclear Reactors861
    Jul 03, 2012: ConocoPhillips Announces Sanction Of Second Train For Australia Pacific LNG Project861
    Jul 02, 2012: KEPCO Resumes Power Generation At Oil-fired Unit 2 At Kainan Power Plant871
    Jul 01, 2012: KEPCO Restarts Unit 3 At Ohi Nuclear Power Plant In Japan871
    Jun 26, 2012: KEPCO Likely To Restart Unit 3 At Ohi Nuclear Power Plant In Japan871
    Jun 16, 2012: Japanese Government Approves Restart Of Power Operations At Two Nuclear Reactors871
    Jun 12, 2012: Fukui Governor In Japan To Approve Restart Of Two Reactors At Oi Nuclear Power Plant871
    Jun 08, 2012: Japanese Prime Minister Urges Restart Of Two Reactors At Ohi Nuclear Power Plant871
    Jun 08, 2012: JNFL Provides Update On Low Enriched Uranium UF6 Transport881
    Jun 06, 2012: NISA Likely To Permit No. 2 Reactor At Mihama Nuclear Power Plant To Operate Beyond 40 Years881
    May 29, 2012: KEPCO Urges Japanese Prime Minister To Approve Restart Of Oi Nuclear Power Plant881
    May 29, 2012: KEPCO To Restart Oil-fired Unit 2 At Kainan Power Plant In July 2012881
    May 28, 2012: Kansai Electric Shuts Down Oil-fired Unit 3 At Kainan Power Project881
    May 17, 2012: JNFL Announces Update On Receipt Of Low-level Radioactive Wastes From Ohi Power Station881
    Apr 20, 2012: Kansai Electric To Restart Oil-fired Unit 3 At Kainan Power Project On April 20, 2012891
    Apr 17, 2012: Kansai Electric Not To Resume Operations At Tanagawa Daini Oil-fired Power Project891
    Apr 17, 2012: JNFL Announces Update On Receipt Of Low-level Radioactive Wastes From Mihama Power Station891
    Apr 13, 2012: Two Idled Reactors At Ohi Nuclear Power Plant Safe To Restart: METI891
    Apr 11, 2012: KEPCO To Spend $2.5 Billion On Enhancing Nuclear Reactor Safety891
    Apr 06, 2012: Japan Approves New Provisional Safety Standards For Nuclear Power Plants891
    Mar 23, 2012: Eurus Energy To Develop 40 MW Solar Power Project In Awaji City, Japan901
    Feb 21, 2012: Kansai Electric Shuts No.3 Reactor At Takahama Nuclear Power Plant For Maintenance901
    Feb 13, 2012: Kansai Electric Postpones Start Of Commercial Operations Of Wind Farm In Japan901
    Feb 13, 2012: NISA Approves Stress Tests For Two Reactors At Ohi Nuclear Power Plant901
    Feb 08, 2012: Japan Likely To Restart Units 3 And 4 Of Ohi Nuclear Plant In April 2012901
    Jan 31, 2012: Kansai Electric To Commence Operations Of Two Gas Turbines At Himeji No.1 Gas-fired Power Station In August 2012901
    Jan 31, 2012: Kansai Electric's No.3 Reactor At Takahama Nuclear Power Plant To Enter Maintenance Phase901
    Jan 26, 2012: IAEA Mission Reviews Safety Assessment At Ohi Nuclear Power Plant901
    Jan 23, 2012: IAEA Review Mission For Assessing Safety At Existing Nuclear Power Plants Arrives In Japan911
    Dec 29, 2011: Talk with Japanese partners on nuclear power projects911
    Dec 20, 2011: MHI Ships First Unit Of M501J Gas Turbine To Kansai Electric's Himeji No.2 Power Station921
    Dec 16, 2011: Kansai Electric's Unit 2 At Ohi Nuclear Plant Enters Schedule Maintenance921
    Dec 07, 2011: Kansai Electric To Close Unit 2 At Mihama Nuclear Power Plant921
    Nov 28, 2011: Kansai Electric To Begin Activities To Resume Unit 2 At Kainan Power Plant In Japan921
    Nov 26, 2011: Kansai Electric Stops No. 2 Reactor At Takahama Nuclear Power Plant921
    Nov 17, 2011: Kansai Electric Submits Stress Results For No.4 Reactor At Ohi Nuclear Plant931
    Nov 07, 2011: Kansai Electric To Use Additional LNG For Power Generation931
    Oct 31, 2011: Coca-Cola System To Make Voluntary Efforts To Reduce Power Consumption Of Vending Machines As Part Of Winter Energy-Saving Measures931
    Oct 28, 2011: Kansai Electric Submits Stress Results For No.3 Reactor At Ohi Nuclear Plant931

Table Of Contents

GlobalData—GlobalData uses proprietary data sources, tools and techniques to gather, analyze and represent the latest and the most reliable information essential for a business to sustain a competitive edge. GlobalData is a comprehensive source of insights and analysis with coverage across the oil & gas, power, alternative energy, nuclear power, petrochemicals, medical equipment and healthcare industries.

About the Author


Cite this Report

  
MLA:
GlobalData. "The Kansai Electric Power Company, Inc. - Power Plants and SWOT Analysis, 2016 Update" Oct 12, 2016. Alacra Store. Nov 15, 2026. <http://www.alacrastore.com/storecontent/GlobalData/The-Kansai-Electric-Power-Company-Inc-Power-Plants-and-SWOT-Analysis-2016-Update-2085-12406>
  
APA:
GlobalData. (2016). The Kansai Electric Power Company, Inc. - Power Plants and SWOT Analysis, 2016 Update Oct 12, 2016. New York, NY: Alacra Store. Retrieved Nov 15, 2026 from <http://www.alacrastore.com/storecontent/GlobalData/The-Kansai-Electric-Power-Company-Inc-Power-Plants-and-SWOT-Analysis-2016-Update-2085-12406>
  
US$ 1,000.00
$  £  €
Have a Question?

Any questions about the report you're considering? Our Customer Service Team can help! Or visit our FAQs.

More Research

Search all our Market Research from one place.