Sections
| Title | Starting Page | Number of Pages |
|---|
| Table of Contents | 2 | 9 |
| List of Tables | 10 | 1 |
| Company Snapshot | 11 | 1 |
| Key Information | 11 | 1 |
| Company Overview | 11 | 1 |
| SWOT Snapshot | 11 | 1 |
| Operational Metrics | 12 | 3 |
| The Kansai Electric Power Company, Inc., Operational Metrics, By Capacity | 12 | 1 |
| The Kansai Electric Power Company, Inc., Operational Metrics, By Generation | 12 | 1 |
| The Kansai Electric Power Company, Inc., Operational Metrics, By Transmission | 12 | 1 |
| The Kansai Electric Power Company, Inc., Operational Metrics, By Distribution | 12 | 1 |
| The Kansai Electric Power Company, Inc., Operational Metrics, By Customers | 13 | 1 |
| The Kansai Electric Power Company, Inc., Operational Metrics, By Segmental Information | 13 | 1 |
| The Kansai Electric Power Company, Inc., Operational Metrics, By Sales | 14 | 1 |
| The Kansai Electric Power Company, Inc., Wind Farms | 15 | 1 |
| The Kansai Electric Power Company, Inc., Wind Farms, Japan | 15 | 1 |
| The Kansai Electric Power Company, Inc., Solar PV Parks | 16 | 3 |
| The Kansai Electric Power Company, Inc., Solar PV Parks, Japan | 16 | 3 |
| The Kansai Electric Power Company, Inc., Hydro Power Plants | 19 | 6 |
| The Kansai Electric Power Company, Inc., Hydro Power Plants, Japan | 19 | 6 |
| The Kansai Electric Power Company, Inc., Thermal Power Plants | 25 | 2 |
| The Kansai Electric Power Company, Inc., Thermal Power Plants, Indonesia | 25 | 2 |
| Business Description | 27 | 1 |
| Business Overview | 27 | 1 |
| Major Products and Services | 27 | 2 |
| History | 29 | 4 |
| SWOT Analysis | 33 | 3 |
| Overview | 33 | 1 |
| The Kansai Electric Power Company, Inc. Strengths | 33 | 1 |
| Business Model: Integrated Structure | 33 | 1 |
| Strong Foothold: Energy Market | 33 | 1 |
| Research and Development Activities | 33 | 1 |
| The Kansai Electric Power Company, Inc. Weaknesses | 34 | 1 |
| Working Capital Deficit | 34 | 1 |
| Substantial Debt | 34 | 1 |
| The Kansai Electric Power Company, Inc. Opportunities | 34 | 1 |
| Positive Outlook For Hydropower: Japan | 34 | 1 |
| Positive Outlook For Thermal Power: Japan | 34 | 1 |
| Strategic Initiatives | 34 | 1 |
| The Kansai Electric Power Company, Inc. Threats | 35 | 1 |
| Regulatory Norms | 35 | 1 |
| Seasonal Variations and Climate Conditions | 35 | 1 |
| Transmission and Distribution Network Security | 35 | 1 |
| Financial Ratios - Capital Market Ratios | 36 | 1 |
| Financial Ratios - Annual Ratios | 37 | 1 |
| Financial Ratios - Interim Ratios | 38 | 1 |
| Key Employees | 39 | 1 |
| Company Statement | 40 | 1 |
| Locations And Subsidiaries | 41 | 2 |
| Head Office | 41 | 1 |
| Other Locations &Subsidiaries | 41 | 2 |
| Financial Deals Landscape | 43 | 1 |
| The Kansai Electric Power Company, Inc., Deals Summary | 43 | 1 |
| The Kansai Electric Power Company, Inc., Power, Deal Details | 44 | 6 |
| Asset Transactions | 44 | 1 |
| Kansai Electric Power Acquires Liquefied Natural Gas-Fired Power Plant in Kanto Region, Japan from Electric Power Development and Mitsui Engineering &Shipbuilding | 44 | 1 |
| Sumitomo, Sumitomo Australia And Kansai Electric Acquire Bluewaters Power Project From Griffin Energy In Australia | 45 | 1 |
| Partnerships | 46 | 1 |
| Japanese Companies Form Joint Venture | 46 | 3 |
| Equity Offering | 49 | 1 |
| Japan Nuclear Fuel Announces Private Placement Of US$867.2 Million | 49 | 1 |
| Recent Developments | 50 | 61 |
| The Kansai Electric Power Company, Inc. - Recent Developments | 50 | 1 |
| Oct 15, 2013: Mongolia shortlists final bidders for Tavan Tolgoi power plant | 50 | 1 |
| Feb 17, 2011: Jordan To Issue Requests For Proposals For Selection Of Reactor Operator | 50 | 1 |
| Jul 27, 2016: Joint implementation of a feasibility study of the offshore wind farm project at Akita Port and Noshiro Port in Akita Prefecture | 50 | 1 |
| Apr 22, 2016: Cooperation between Electric Power Companies in Nuclear Power Operation | 50 | 1 |
| Jan 25, 2016: Kansai Electric and Shiga prefecture ink safety accord for Takahama nuclear power plant | 51 | 1 |
| May 28, 2015: BP And Kansai Electric Sign LNG Sale And Purchase Agreement And Cooperation Agreements | 51 | 1 |
| May 07, 2014: Kansai Electric signs agreement with Iberdrola to share information on nuclear reactor operations | 51 | 1 |
| Nov 27, 2011: Kansai Electric Plans To Construct Two 500kW Solar Power Plants In Fukui Prefecture, Japan | 51 | 1 |
| Nov 17, 2010: Kansai Electric, EDF Sign Nuclear Cooperation Agreement | 52 | 1 |
| Jul 21, 2010: Toshiba Evinces Interest In Reviving Bataan Nuclear Power Plant | 52 | 1 |
| Jul 06, 2010: Japanese Consortium Establishes New Office For International Nuclear Energy Development of Japan | 52 | 1 |
| Jan 30, 2009: Kansai To Build 24 MW Wind Farm In Japan | 52 | 1 |
| Jun 23, 2008: Kansai Electric, Sharp Announce Mega Solar Power Generation Plan In Sakai City Waterfront | 53 | 1 |
| Feb 15, 2008: Kansai Electric Power Plans To Build Solar Power Plant In Osaka | 53 | 1 |
| Dec 26, 2007: Kansai Electric, Kazatomprom Sign MoU To Outsource Uranium Processing For Nuclear Power Plants | 53 | 1 |
| May 23, 2011: Woodside Energy Discovers Gas At Xeres-1 Well At WA-34-L License In Carnarvon Basin, Western Australia | 53 | 1 |
| Apr 30, 2012: Woodside Petroleum Begins Production From Pluto LNG Project In Western Australia | 53 | 1 |
| Feb 25, 2016: United Tractors Recorded Consolidated Net Revenue of Rp 49.3 Trillion for 2015 | 54 | 1 |
| Apr 30, 2013: Kansai Electric Reports Revenue Of JPY2.9 Trillion In Fiscal 2013 | 55 | 1 |
| Jan 31, 2013: Kansai Electric Reports Revenue Of JPY2.1 Trillion For Nine Months Of December 31, 2012 | 55 | 1 |
| Oct 29, 2012: Kansai Electric Reports Revenue Of JPY1.4 Trillion In H1 Fiscal 2013 | 55 | 1 |
| Jul 30, 2012: Kansai Electric Reports Revenue Of JPY648.3 Billion In Q1 Fiscal 2013 | 55 | 1 |
| Apr 27, 2012: Kansai Electric Reports Revenue Of JPY2.8 Trillion In Fiscal 2012 | 55 | 1 |
| Jan 31, 2012: Kansai Electric Reports Revenue Of JPY2 Trillion For Nine Months Of Fiscal 2012 | 55 | 1 |
| Oct 31, 2011: Kansai Electric Reports Revenue Of JPY1.4 Trillion In H1 Fiscal 2012 | 55 | 1 |
| Jul 28, 2011: Kansai Electric Reports Operating Revenues Of JPY647.4 Billion In Q1 Fiscal Year Ended 2012 | 56 | 1 |
| Apr 27, 2011: Kansai Electric Reports Operating Revenues Of JPY2.8 Trillion In Fiscal Year Ended 2011 | 56 | 1 |
| Jan 31, 2011: Kansai Electric Reports Nine Months Fiscal 2011 Results | 56 | 1 |
| Oct 28, 2010: KEPCO Reports Net Income Of JPY77.34 Billion For H1 Fiscal 2011 | 56 | 1 |
| Jul 29, 2010: Kansai Electric Reports Operating Revenues Of JPY618.51 Billion In Q1 Fiscal 2011 | 56 | 1 |
| Apr 28, 2010: Kansai Electric Reports Net Income Of JPY127.2 Billion In Fiscal 2010 | 56 | 1 |
| Jan 29, 2010: Kansai Electric Reports Operating Revenues Of JPY1.89 Trillion In Nine Months Period Of Fiscal 2010 | 56 | 1 |
| Oct 30, 2009: Kansai Electric Reports Operating Revenues Of JPY1.29 Trillion In H1 Of Fiscal 2010 | 56 | 1 |
| Jul 30, 2009: Kansai Electric Reports Operating Revenues Of JPY608.14 Billion In Q1 Fiscal 2010 | 56 | 1 |
| Jan 30, 2009: Kansai Electric Reports Nine Months Fiscal 2009 Results | 57 | 1 |
| Oct 31, 2008: Kansai Electric Reports H1 Fiscal 2009 Results | 57 | 1 |
| Jul 31, 2008: Kansai Electric Reports 1Q Fiscal 2009 Results | 57 | 1 |
| Apr 30, 2008: Kansai Electric Reports Fiscal 2008 Results | 57 | 1 |
| Jan 30, 2008: Kansai Electric Reports Nine Months Fiscal 2008 Results | 57 | 1 |
| Oct 30, 2007: Kansai Electric Reports H1 Fiscal 2008 Results | 57 | 1 |
| Jul 31, 2007: Kansai Electric Reports Q1 Fiscal 2008 Results | 57 | 1 |
| Apr 27, 2007: Kansai Electric Reports Fiscal 2007 Results | 57 | 1 |
| Jan 30, 2007: Kansai Electric Reports Nine Months Fiscal 2007 Results | 57 | 1 |
| Oct 05, 2016: Kansai Electric s Mihama 3 nuclear unit secures 20 year extension | 58 | 1 |
| Aug 17, 2016: Kansai Electric begins fuel removal at Takahama No. 4 nuclear reactor in Fukui Prefecture | 58 | 1 |
| Aug 03, 2016: NRA grants safety approval for Mihama 3 nuclear power reactor in Fukui Prefecture, Japan | 58 | 1 |
| Jul 12, 2016: For re-submission of the amendment of the Takahama Nuclear Power Plant Units 3 and 4 of the specific serious accident such as deal facility on the reactor installation change permit application | 58 | 1 |
| Jul 12, 2016: Japanese court rules against restart of Takahama nuclear reactors | 59 | 1 |
| Jul 01, 2016: BP Announces Final Investment Decision To Expand Indonesia s Tangguh LNG Facility | 59 | 1 |
| Jun 30, 2016: Australia Pacific LNG Commences Exports To Kansai Electric | 60 | 1 |
| Jun 20, 2016: Kansai Electric gets approval to extend life of two reactors at Takahama nuclear facility | 60 | 1 |
| Jun 17, 2016: Japanese court uphelds injuction on restart of Takahama nuclear power reactors | 60 | 1 |
| Apr 19, 2016: Kansai Electric s Units 1 and 2 at Takahama nuclear plant obtain safety approval | 60 | 1 |
| Apr 19, 2016: Japan Asia Group completes Hubei solar way power plant in Shiga prefecture | 61 | 1 |
| Apr 01, 2016: Toshiba's first adjustable-speed power generation system for small hydro has started commercial operation | 61 | 1 |
| Mar 14, 2016: Appeal of an Objection to the Provisional Disposition to Suspend Operation of Takahama Units 3 and 4 | 61 | 1 |
| Mar 10, 2016: Kansai Electric Power: Shutdown of Takahama Unit 3 | 61 | 1 |
| Mar 09, 2016: Shutdown of Takahama Unit 3 | 61 | 1 |
| Mar 09, 2016: Decision of a provisional disposition preventing the operation of Units 3 and 4 of Takahama Nuclear Power Station: The Kansai Electric Power | 62 | 1 |
| Mar 09, 2016: Submission of a Report on Failure/Event of the Nuclear Installation for Takahama Unit 4 | 62 | 2 |
| Feb 29, 2016: Kansai Electric's Takahama 4 nuclear power unit shuts down automatically | 64 | 1 |
| Feb 26, 2016: Announcement of Return to Commercial Operation of Takahama Unit 3 | 64 | 1 |
| Feb 26, 2016: Startup of Takahama Unit 4: The Kansai Electric Power | 64 | 1 |
| Feb 24, 2016: Kansai Electric obtains approval to extend operational life of Takahama 1 and 2 nuclear reactors in Japan | 65 | 1 |
| Feb 23, 2016: Heerema Marine Contractors Announces Infield Flowlines Scope Ichthys Project Completed | 65 | 1 |
| Feb 22, 2016: Causes of and Corrective Action against Water Leakage within the Controlled Area at Takahama Unit 4 | 66 | 1 |
| Feb 22, 2016: Kansai Electric's Unit 4 at Takahama nuclear plant to resume operations | 67 | 1 |
| Feb 20, 2016: Water Leakage within the Controlled Area at Takahama Unit 4: The Kansai Electric Power Company | 67 | 1 |
| Feb 12, 2016: JAPC and Kansai Electric plans to decommission three nuclear reactors in Japan | 68 | 1 |
| Jan 29, 2016: Kansai Electric restarts Takahama 3 nuclear unit in Japan | 68 | 1 |
| Jan 28, 2016: Schedule of Takahama Unit No. 3 Reactor Startup and Power Control Operation | 68 | 1 |
| Dec 29, 2015: Kansai Electric Power completes fuel loading at Takahama 3 nuclear unit | 68 | 1 |
| Dec 24, 2015: Order on objection to the decision of a provisional disposition preventing the operation of Units 3 and 4 of Takahama Nuclear Power Station | 68 | 1 |
| Dec 24, 2015: Fukui District Court overturns injunction against Takahama reactor restarts | 69 | 1 |
| Dec 22, 2015: Fukui governor approves restart of Takahama nuclear reactor restarts | 69 | 1 |
| Dec 03, 2015: Mayor approves to restart Kansai Electric s nuclear reactors in Takahama, Japan | 69 | 1 |
| Nov 26, 2015: Application for Permission to Extend the Operating Period and Application for Approval of Construction Plans of Unit 3 at Mihama Nuclear Power Station | 69 | 1 |
| Nov 10, 2015: Mitsui: Newbuilding LNG Carrier For Kansai Electric Power Named LNG JUROJIN | 70 | 1 |
| Nov 05, 2015: INPEX-Operated Ichthys LNG Project Completes Offshore Pipelay | 71 | 1 |
| Oct 09, 2015: Completion of the 3-step conformity review on the New Regulatory Requirements for Takahama NPS Units 3 and 4 | 71 | 1 |
| Aug 13, 2015: Kansai Electric to evaluate solar energy generation through satellites | 71 | 1 |
| Jul 28, 2015: Newbuilding LNG Carrier For Kansai Electric Power Named LNG Fukurokuju | 72 | 1 |
| Jun 16, 2015: Operation of the 4th low-level radioactive waste transport this fiscal year | 72 | 1 |
| May 27, 2015: Operation of the 3rd low-level radioactive waste transport this fiscal year | 72 | 1 |
| May 19, 2015: Fukui District Court discards Kansai Electric s appeal of nuclear ruling | 72 | 1 |
| May 12, 2015: KEPCO: Measures to mitigate electricity rates | 72 | 1 |
| May 09, 2015: For automatic stop due to the vibration of the Himeji No. 2 Power Station Unit 3 steam turbine | 73 | 1 |
| Apr 30, 2015: Kansai Electric files application to extend operating life of two reactors at Takahama NPP | 73 | 1 |
| Apr 24, 2015: Operation of the 1st low-level radioactive waste transport this fiscal year | 73 | 1 |
| Apr 14, 2015: Japanese Court blocks restart of two Takahama nuclear reactors | 73 | 1 |
| Apr 09, 2015: Kansai Electric secures 10-year life extension for Takahama 2 nuclear unit in Japan | 74 | 1 |
| Apr 02, 2015: NRA begins review of Kansai Electric s three nuclear reactors in Japan | 74 | 1 |
| Mar 17, 2015: Kansai Electric to decommission two reactor units at Mihama NPP in Japan | 74 | 1 |
| Feb 12, 2015: NRA issues safety clearance for Takahama 3 and 4 nuclear reactors | 75 | 1 |
| Feb 05, 2015: Kansai Electric submits revised work plans for two Takahama nuclear power units | 75 | 1 |
| Jan 07, 2015: Kansai Electric set to ink safety agreements with local governments | 75 | 1 |
| Dec 25, 2014: Japanese utilities expects to decide whether to decommission five nuclear reactors | 75 | 1 |
| Dec 17, 2014: NRA approves restart of Takahama nuclear reactors | 76 | 1 |
| Dec 13, 2014: NRA to submit draft report on Takahama NPP safety measures | 76 | 1 |
| Dec 01, 2014: Kansai Electric begins special inspection at Takahama nuclear reactors | 76 | 1 |
| Nov 13, 2014: Kansai Electric may seek to extend operating life of two units at Takahama NPP | 76 | 1 |
| Aug 28, 2014: Japan Nuclear Fuel: Operation of the 1st spent fuel transport this fiscal year | 77 | 1 |
| Jun 11, 2014: Japan Nuclear Fuel: Operation of the 3rd low-level radioactive waste transport this fiscal year | 77 | 1 |
| Jun 05, 2014: First M501J Gas Turbine for Commercial-use Tops 8,000 Hours in Service At Kansai Electric Power's Himeji No.2 Power Station | 77 | 1 |
| May 27, 2014: Kansai Electric likely to restart reactors at Oi nuclear plant | 77 | 1 |
| May 21, 2014: Kansai Electric s plans to restart Ohi nuclear reactors blocked by court | 78 | 1 |
| May 21, 2014: Japan Nuclear Fuel: Operation of the 2nd low-level radioactive waste transport this fiscal year | 78 | 1 |
| May 10, 2014: Kansai Electric to increase earthquake force estimate for Oi nuclear power plant | 78 | 1 |
| May 02, 2014: Japan Nuclear Fuel: Operation of the 1st low-level radioactive waste transport this fiscal year | 78 | 1 |
| Apr 23, 2014: The status of the compliance examination of our nuclear power plants to New Regulatory Standards | 78 | 1 |
| Mar 05, 2014: Kansai Electric reports minor fire at Takahama 3 nuclear reactor in Japan | 79 | 1 |
| Oct 17, 2013: Kansai Electric closes Maizuru coal-fired power plant in Japan due to typhoon | 79 | 1 |
| Sep 15, 2013: Kansai Electric To Disconnect Unit 4 At Ohi Nuclear Power Plant From Grid | 79 | 1 |
| Sep 02, 2013: NRA Says No Fault Line Beneath Ohi Nuclear Power Station In Japan | 79 | 1 |
| Sep 02, 2013: Kansai Electric Shuts Unit 3 At Ohi Nuclear Power Plant In Japan | 79 | 1 |
| Aug 13, 2013: Kansai Electric To Shut Units 3 And 4 Of Ohi Nuclear Power Plant In September 2013 | 80 | 1 |
| Jun 26, 2013: Areva Announces Arrival Of MOX Shipment From France To Japan | 80 | 1 |
| Jun 16, 2013: NRA Begins On-site Inspection Of Units 3 And 4 At Ohi Nuclear Power Plant | 80 | 1 |
| Apr 27, 2013: Kansai Electric Likely To Seek Permit For Restart Of Units 3 And 4 At Takahama Nuclear Power Plant | 80 | 1 |
| Apr 24, 2013: JNFL Announces Receipt Of LLRW From Takahama Nuclear Power Station In Japan | 80 | 1 |
| Apr 23, 2013: Dominion CEO Makes Case For US LNG Exports | 80 | 1 |
| Apr 19, 2013: NRA To Check Units 3 And 4 At Oi Nuclear Power Plant In Fukui Prefecture, Japan | 81 | 1 |
| Apr 16, 2013: Japanese Court Rejects Petition To Close Two Reactors At Ohi Nuclear Nuclear Power Plant In Japan | 81 | 1 |
| Apr 02, 2013: Kansai Electric Receives Approval To Increase Electricity Rates | 81 | 1 |
| Apr 01, 2013: Dominion Moves Forward With Liquefaction Project | 81 | 1 |
| Mar 27, 2013: Kansai Electric To Load MOX Fuel At Takahama Nuclear Power Plant In 2014 | 82 | 1 |
| Mar 20, 2013: NRA Allows Kansai Electric To Continue Operations Of Oi Nuclear Power Plant Until September 2013 | 83 | 1 |
| Mar 09, 2013: JAPC To Receive Financial Assistance Of JPY140 Billion | 83 | 1 |
| Jan 25, 2013: Kansai Electric To Invest JPY285 Billion To Increase Nuclear Safety | 83 | 1 |
| Dec 28, 2012: NRA Begins Second Fault Survey At Ohi Nuclear Power Plant In Japan | 83 | 1 |
| Dec 20, 2012: Kansai Electric Begins Commercial Operations At 12 MW Wind Farm In Japan | 83 | 1 |
| Dec 05, 2012: Japan To Receive Radioactive Waste From UK By February 2014 | 83 | 1 |
| Nov 26, 2012: JNFL Announces Receipt Of Spent Fuel Assemblies From Three Nuclear Power Stations | 83 | 1 |
| Nov 25, 2012: Kansai Electric Seeks Approval For Hike In Residential And Commercial Electricity Prices | 84 | 1 |
| Nov 22, 2012: Kansai Electric To Restart Two Reactors At Takahama Nuclear Power Station | 84 | 1 |
| Nov 20, 2012: Kansai Electric To Purchase LNG From BP Singapore For 15 Years | 84 | 1 |
| Oct 31, 2012: KEPCO Finds No Active Fault Under Ohi Nuclear Plant In Japan | 84 | 1 |
| Oct 29, 2012: Kansai Electric Considers Power Tariff Hike | 84 | 1 |
| Oct 15, 2012: JNFL Provides Update On Receipt Of Low-level Radioactive Wastes From Two Nuclear Power Stations In Japan | 84 | 1 |
| Sep 20, 2012: Kansai Electric Restarts Oil-fired Unit 2 At Kainan Power Plant | 85 | 1 |
| Sep 18, 2012: Chubu Electric Suspends Power Generation At Unit 3 Of Atsumi Oil-fired Power Plant | 85 | 1 |
| Sep 05, 2012: Kansai Electric Closes Oil-fired Unit 2 At Kainan Power Plant | 85 | 1 |
| Aug 24, 2012: NISA Directs Additional Inspection At Mihama And Monju Nuclear Power Plants | 85 | 1 |
| Jul 26, 2012: KEPCO Intends To Restart Two Reactors At Takahama Nuclear Power Plant | 85 | 1 |
| Jul 21, 2012: KEPCO Resumes Power Generation At Unit 4 Of Ohi Nuclear Power Plant In Japan | 85 | 1 |
| Jul 19, 2012: KEPCO Restarts Unit 4 At Ohi Nuclear Power Plant In Japan | 85 | 1 |
| Jul 12, 2012: KEPCO Plans To Restart Unit 4 At Ohi Nuclear Power Plant In Japan | 85 | 1 |
| Jul 08, 2012: KEPCO's Unit 3 At Ohi Nuclear Power Plant Reaches Full Capacity | 85 | 1 |
| Jul 04, 2012: NISA To Urge Reassessment Of Fault Lines Near Fukui Nuclear Reactors | 86 | 1 |
| Jul 03, 2012: ConocoPhillips Announces Sanction Of Second Train For Australia Pacific LNG Project | 86 | 1 |
| Jul 02, 2012: KEPCO Resumes Power Generation At Oil-fired Unit 2 At Kainan Power Plant | 87 | 1 |
| Jul 01, 2012: KEPCO Restarts Unit 3 At Ohi Nuclear Power Plant In Japan | 87 | 1 |
| Jun 26, 2012: KEPCO Likely To Restart Unit 3 At Ohi Nuclear Power Plant In Japan | 87 | 1 |
| Jun 16, 2012: Japanese Government Approves Restart Of Power Operations At Two Nuclear Reactors | 87 | 1 |
| Jun 12, 2012: Fukui Governor In Japan To Approve Restart Of Two Reactors At Oi Nuclear Power Plant | 87 | 1 |
| Jun 08, 2012: Japanese Prime Minister Urges Restart Of Two Reactors At Ohi Nuclear Power Plant | 87 | 1 |
| Jun 08, 2012: JNFL Provides Update On Low Enriched Uranium UF6 Transport | 88 | 1 |
| Jun 06, 2012: NISA Likely To Permit No. 2 Reactor At Mihama Nuclear Power Plant To Operate Beyond 40 Years | 88 | 1 |
| May 29, 2012: KEPCO Urges Japanese Prime Minister To Approve Restart Of Oi Nuclear Power Plant | 88 | 1 |
| May 29, 2012: KEPCO To Restart Oil-fired Unit 2 At Kainan Power Plant In July 2012 | 88 | 1 |
| May 28, 2012: Kansai Electric Shuts Down Oil-fired Unit 3 At Kainan Power Project | 88 | 1 |
| May 17, 2012: JNFL Announces Update On Receipt Of Low-level Radioactive Wastes From Ohi Power Station | 88 | 1 |
| Apr 20, 2012: Kansai Electric To Restart Oil-fired Unit 3 At Kainan Power Project On April 20, 2012 | 89 | 1 |
| Apr 17, 2012: Kansai Electric Not To Resume Operations At Tanagawa Daini Oil-fired Power Project | 89 | 1 |
| Apr 17, 2012: JNFL Announces Update On Receipt Of Low-level Radioactive Wastes From Mihama Power Station | 89 | 1 |
| Apr 13, 2012: Two Idled Reactors At Ohi Nuclear Power Plant Safe To Restart: METI | 89 | 1 |
| Apr 11, 2012: KEPCO To Spend $2.5 Billion On Enhancing Nuclear Reactor Safety | 89 | 1 |
| Apr 06, 2012: Japan Approves New Provisional Safety Standards For Nuclear Power Plants | 89 | 1 |
| Mar 23, 2012: Eurus Energy To Develop 40 MW Solar Power Project In Awaji City, Japan | 90 | 1 |
| Feb 21, 2012: Kansai Electric Shuts No.3 Reactor At Takahama Nuclear Power Plant For Maintenance | 90 | 1 |
| Feb 13, 2012: Kansai Electric Postpones Start Of Commercial Operations Of Wind Farm In Japan | 90 | 1 |
| Feb 13, 2012: NISA Approves Stress Tests For Two Reactors At Ohi Nuclear Power Plant | 90 | 1 |
| Feb 08, 2012: Japan Likely To Restart Units 3 And 4 Of Ohi Nuclear Plant In April 2012 | 90 | 1 |
| Jan 31, 2012: Kansai Electric To Commence Operations Of Two Gas Turbines At Himeji No.1 Gas-fired Power Station In August 2012 | 90 | 1 |
| Jan 31, 2012: Kansai Electric's No.3 Reactor At Takahama Nuclear Power Plant To Enter Maintenance Phase | 90 | 1 |
| Jan 26, 2012: IAEA Mission Reviews Safety Assessment At Ohi Nuclear Power Plant | 90 | 1 |
| Jan 23, 2012: IAEA Review Mission For Assessing Safety At Existing Nuclear Power Plants Arrives In Japan | 91 | 1 |
| Dec 29, 2011: Talk with Japanese partners on nuclear power projects | 91 | 1 |
| Dec 20, 2011: MHI Ships First Unit Of M501J Gas Turbine To Kansai Electric's Himeji No.2 Power Station | 92 | 1 |
| Dec 16, 2011: Kansai Electric's Unit 2 At Ohi Nuclear Plant Enters Schedule Maintenance | 92 | 1 |
| Dec 07, 2011: Kansai Electric To Close Unit 2 At Mihama Nuclear Power Plant | 92 | 1 |
| Nov 28, 2011: Kansai Electric To Begin Activities To Resume Unit 2 At Kainan Power Plant In Japan | 92 | 1 |
| Nov 26, 2011: Kansai Electric Stops No. 2 Reactor At Takahama Nuclear Power Plant | 92 | 1 |
| Nov 17, 2011: Kansai Electric Submits Stress Results For No.4 Reactor At Ohi Nuclear Plant | 93 | 1 |
| Nov 07, 2011: Kansai Electric To Use Additional LNG For Power Generation | 93 | 1 |
| Oct 31, 2011: Coca-Cola System To Make Voluntary Efforts To Reduce Power Consumption Of Vending Machines As Part Of Winter Energy-Saving Measures | 93 | 1 |
| Oct 28, 2011: Kansai Electric Submits Stress Results For No.3 Reactor At Ohi Nuclear Plant | 93 | 1 |