Title | Starting Page | Number of Pages |
---|
Table of Contents | 4 | 14 |
List of Tables | 10 | 3 |
List of Figures | 13 | 5 |
Introduction | 18 | 4 |
Steam Generators for Nuclear Power, Overview | 18 | 1 |
Steam Generators for Nuclear Power, Design Description | 19 | 1 |
Recirculating Steam Generators | 19 | 1 |
Once-Through Steam Generators | 19 | 1 |
WWER Steam Generators | 20 | 1 |
Global Data Report Guidance | 20 | 2 |
Steam Generators for Nuclear Power, Global | 22 | 11 |
Steam Generators for Nuclear Power, Global, Capacity and Generation Overview | 22 | 2 |
Steam Generators for Nuclear Power, Global, Drivers | 24 | 1 |
Increasing Power Demand | 24 | 1 |
Reduction in Greenhouse Gas Emission | 25 | 1 |
Technological Advancement | 25 | 1 |
Soaring Fossil Fuel Prices Coupled with Scarcity of Energy Sources | 26 | 1 |
Steam Generators for Nuclear Power, Global, Restraints | 26 | 1 |
Safety Concerns | 26 | 1 |
Nuclear Waste Disposal Issues Affecting the Nuclear Power Industry | 26 | 1 |
Anti-nuclear Public Opinion: Driving Countries away from Nuclear Power | 27 | 1 |
Nuclear Power Projects Are Highly Capital Intensive | 27 | 1 |
Impact of Renewable Energy | 27 | 1 |
Steam Generators for Nuclear Power, Global, Regional Market Size Analysis, 2010 2015 | 28 | 1 |
Steam Generators for Nuclear Power, Global, Market Analysis | 29 | 1 |
Steam Generators for Nuclear Power, Global, Market Size (Unit), 2010 2025 | 29 | 1 |
Steam Generators for Nuclear Power, Global, Market Size ($m), 2010 2025 | 30 | 1 |
Steam Generators for Nuclear Power, Global, Competitive Landscape | 31 | 2 |
Steam Generators for Nuclear Power, North America | 33 | 30 |
Steam Generators for Nuclear Power, North America, Capacity and generation, 2010 2025 | 33 | 1 |
Steam Generators for Nuclear Power, North America, Country Market Size Analysis, 2010 2015 | 34 | 2 |
Steam Generators for Nuclear Power, North America, Market Size Analysis, 2010 2025 | 36 | 1 |
Steam Generators for Nuclear Power, North America, Market Size (units), 2010 2025 | 36 | 1 |
Steam Generators for Nuclear Power, North America, Market Size ($m), 2010 2025 | 37 | 1 |
Steam Generators for Nuclear Power, US | 38 | 1 |
Steam Generators for Nuclear Power, US, Capacity and Generation, 2010 2025 | 38 | 4 |
Steam Generators for Nuclear Power, US, Drivers | 42 | 1 |
US Nuclear fuel cycle | 42 | 1 |
Public Opinion | 43 | 1 |
Regulatory Initiatives | 43 | 1 |
Steam Generators for Nuclear Power, US, Restraints | 43 | 1 |
Waste Disposal Issue | 43 | 1 |
Shale Gas Revolution | 43 | 1 |
Lack of Skilled Workers in the Nuclear Industry | 44 | 1 |
Steam Generators for Nuclear Power, US, Key Regulations, Authorities and Government Agencies | 44 | 1 |
Key Regulations and Policies | 44 | 1 |
Key Regulatory Authorities | 45 | 1 |
Responsibilities of Other Government Agencies | 46 | 1 |
Steam Generators for Nuclear Power, US, Market Size Analysis, 2010 2025 | 47 | 1 |
Steam Generators for Nuclear Power, US, Market Size (units), 2010 2025 | 47 | 1 |
Steam Generators for Nuclear Power, US, Market Size ($m), 2010 2025 | 48 | 1 |
Steam Generators for Nuclear Power, US, Competitive Landscape | 49 | 1 |
Steam Generators for Nuclear Power, Areva SA, Key Activities in the US | 50 | 1 |
Steam Generators for Nuclear Power, Westinghouse Electric Company, LLC, Key Activities in the US | 50 | 1 |
Steam Generators for Nuclear Power, the Babcock &Wilcox Company, Key Activities in the US | 51 | 1 |
Steam Generators for Nuclear Power, Canada, 2010 2025 | 52 | 1 |
Steam Generators for Nuclear Power, Capacity and Generation Overview, Canada | 52 | 3 |
Steam Generators for Nuclear Power, Canada, Drivers | 55 | 1 |
Abundant Uranium Reserves | 55 | 1 |
The Need to Reduce Carbon Emissions | 56 | 1 |
Regulatory Scenario | 56 | 1 |
Steam Generators for Nuclear Power, Canada, Restraints | 56 | 1 |
High Refurbishment Cost for Continued Operations | 56 | 1 |
Safety Concerns and Anti-Nuclear Public Opinion | 57 | 1 |
Steam Generators for Nuclear Power, Canada, Key Regulations and Policies | 57 | 1 |
Canadian Environmental Assessment Act | 57 | 1 |
Nuclear Liability and Compensation Act (in force from 2017) | 57 | 1 |
Nuclear Legacy Liabilities Program | 57 | 1 |
Nuclear safety and control act | 58 | 1 |
Steam Generators for Nuclear Power, Canada, Key Regulatory Authorities | 58 | 1 |
Steam Generators for Nuclear Power, Canada, Market Size Analysis, 2010 2025 | 59 | 1 |
Steam Generators for Nuclear Power, Canada, Market Size (units), 2010 2025 | 59 | 1 |
Steam Generators for Nuclear Power, Canada, Market Size ($m), 2010 2025 | 60 | 1 |
Steam Generators for Nuclear Power, Competitive Landscape, Canada | 61 | 2 |
Steam Generators for Nuclear Power, Europe | 63 | 44 |
Steam Generators for Nuclear Power, Europe, Capacity and generation, 2010 2025 | 63 | 2 |
Steam Generators for Nuclear Power, Europe, Country Market Size Analysis, 2010 2015 | 65 | 2 |
Steam Generators for Nuclear Power, Europe, Market Size Analysis, 2010 2025 | 67 | 1 |
Steam Generators for Nuclear Power, Europe, Market Size (units), 2010 2025 | 67 | 1 |
Steam Generators for Nuclear Power, Europe, Market Size ($m), 2010 2025 | 68 | 1 |
Steam Generators for Nuclear Power, France | 69 | 1 |
Steam Generators for Nuclear Power, France, Capacity and Generation, 2010 2025 | 69 | 3 |
Steam Generators for Nuclear Power, France, Drivers | 72 | 1 |
Strong In-house Capability to Build Nuclear Power Plants | 72 | 1 |
Need to Reduce Carbon Emissions | 72 | 1 |
The Oil Crisis of the 1970s | 73 | 1 |
Steam Generators for Nuclear Power, France, Restraints | 73 | 1 |
Political Opposition to Nuclear Power | 73 | 1 |
Anti-Nuclear Public Opinion | 73 | 1 |
Steam Generators for Nuclear Power, France, Key Regulations, Authorities and Government Agencies | 74 | 1 |
Key Regulations and Policies | 74 | 1 |
Steam Generators for Nuclear Power, France, Key Regulatory Bodies | 74 | 1 |
Steam Generators for Nuclear Power, France, Market Size Analysis, 2010 2025 | 75 | 1 |
Steam Generators for Nuclear Power, US, Market Size (units), 2010 2025 | 76 | 1 |
Steam Generators for Nuclear Power, France, Market Size ($m), 2010 2025 | 77 | 1 |
Steam Generators for Nuclear Power, Competitive Landscape, France | 78 | 1 |
Steam Generators for Nuclear Power, Russia | 78 | 1 |
Steam Generators for Nuclear Power, Russia, Capacity and Generation, 2010 2025 | 78 | 3 |
Steam Generators for Nuclear Power, Russia, Drivers | 81 | 1 |
Growing Power Demand | 81 | 1 |
Numerous Inter-governmental Agreements | 82 | 1 |
Steam Generators for Nuclear Power, Russia, Restraints | 82 | 1 |
Huge Fossil Fuel Reserves | 82 | 1 |
Steam Generators for Nuclear Power, Russia, Key Regulations, Authorities and Government Agencies | 82 | 1 |
Steam Generators for Nuclear Power, Russia, Key Regulations | 82 | 2 |
Steam Generators for Nuclear Power, Russia, Key Regulatory Bodies | 84 | 1 |
Steam Generators for Nuclear Power, Russia, Market Size Analysis, 2010 2025 | 85 | 1 |
Steam Generators for Nuclear Power, Russia, Market Size (units), 2010 2025 | 85 | 1 |
Steam Generators for Nuclear Power, Russia, Market Size ($m), 2010 2025 | 86 | 1 |
Steam Generators for Nuclear Power, Competitive Landscape, Russia | 87 | 1 |
Steam Generators for Nuclear Power, Ukraine | 88 | 1 |
Steam Generators for Nuclear Power, Ukraine, Capacity and Generation, 2010 2025 | 88 | 3 |
Steam Generators for Nuclear Power, Ukraine, Drivers | 91 | 1 |
Developing Nuclear Capacity to Reduce Reliance on Fossil Fuel Imports | 91 | 1 |
Ukraine Intends to Extend Operating Life of Nuclear Power Plants | 92 | 1 |
Steam Generators for Nuclear Power, Ukraine, Restraints | 92 | 1 |
Lack of Fuel Cycle Facilities | 92 | 1 |
Ukraine Crisis | 92 | 1 |
Steam Generators for Nuclear Power, Ukraine, Key Regulations, Authorities and Government Agencies | 92 | 1 |
Steam Generators for Nuclear Power, Ukraine, Key Regulations | 92 | 1 |
Steam Generators for Nuclear Power, Ukraine, Key Regulatory Authorities | 93 | 1 |
Steam Generators for Nuclear Power, Ukraine, Market Size Analysis, 2010 2025 | 94 | 1 |
Steam Generators for Nuclear Power, Ukraine, Market Size (units), 2010 2025 | 94 | 1 |
Steam Generators for Nuclear Power, Ukraine, Market Size ($m), 2010 2025 | 95 | 1 |
Steam Generators for Nuclear Power, Competitive Landscape, Ukraine | 96 | 1 |
Steam Generators for Nuclear Power, UK | 97 | 1 |
Steam Generators for Nuclear Power, UK, Capacity and Generation, 2010 2025 | 97 | 3 |
Steam Generators for Nuclear Power, UK, Drivers | 100 | 1 |
Availability of Fuel Cycle Facilities | 100 | 1 |
Greenhouse Gas Emissions Target | 101 | 1 |
Steam Generators for Nuclear Power, UK, Restraints | 101 | 1 |
Need to Import Uranium will Subject Fuel Supply to Price Fluctuations and Geopolitical Disturbances | 101 | 1 |
Economic Crisis Reduces the Finance Required for Investment in the Nuclear Sector | 101 | 1 |
Steam Generators for Nuclear Power, UK, Key Regulations, Authorities and Government Agencies | 101 | 1 |
Steam Generators for Nuclear Power, UK, Key Regulations | 101 | 1 |
Steam Generators for Nuclear Power, UK, Key Regulatory Bodies | 102 | 1 |
Steam Generators for Nuclear Power, UK, Market Size Analysis, 2010 2025 | 103 | 1 |
Steam Generators for Nuclear Power, UK, Market Size (units), 2010 2025 | 103 | 1 |
Steam Generators for Nuclear Power, UK, Market Size ($m), 2010 2025 | 104 | 2 |
Steam Generators for Nuclear Power, Competitive Landscape, UK | 106 | 1 |
Steam Generators for Nuclear Power, Asia-Pacific | 107 | 53 |
Steam Generators for Nuclear Power, Asia-Pacific, Capacity and generation, 2010 2025 | 107 | 2 |
Steam Generators for Nuclear Power, Asia-Pacific, Country Market Size Analysis, 2010 2025 | 109 | 2 |
Steam Generators for Nuclear Power, Asia-Pacific, Market Size Analysis, 2010 2025 | 111 | 1 |
Steam Generators for Nuclear Power, Asia-Pacific, Market Size (units), 2010 2025 | 111 | 1 |
Steam Generators for Nuclear Power, Asia-Pacific, Market Size ($m), 2010 2025 | 112 | 2 |
Steam Generators for Nuclear Power, China | 114 | 1 |
Steam Generators for Nuclear Power, China, Capacity and Generation, 2010 2025 | 114 | 3 |
Steam Generators for Nuclear Power, China, Drivers | 117 | 1 |
Soaring Demand for Power | 117 | 1 |
Carbon Emission Targets | 118 | 1 |
Steam Generators for Nuclear Power, China, Restraints | 118 | 1 |
Uranium Shortage | 118 | 1 |
Public opposition | 118 | 1 |
Lack in Fuel Fabrication Facilities | 118 | 1 |
Steam Generators for Nuclear Power, China, Key Regulations, Authorities and Government Agencies | 119 | 1 |
Steam Generators for Nuclear Power, China, Key Regulations | 119 | 1 |
Steam Generators for Nuclear Power, China, Key Regulatory Authorities | 120 | 1 |
Steam Generators for Nuclear Power, China, Market Size Analysis, 2010 2025 | 121 | 1 |
Steam Generators for Nuclear Power, China, Market Size (Units), 2010 2025 | 121 | 1 |
Steam Generators for Nuclear Power, China, Market Size ($m), 2010 2025 | 122 | 1 |
Steam Generators for Nuclear Power, China, Competitive Landscape | 123 | 1 |
Steam Generators for Nuclear Power, India | 124 | 1 |
Steam Generators for Nuclear Power, India, Capacity and Generation, 2010 2025 | 124 | 4 |
Steam Generators for Nuclear Power, India, Drivers | 128 | 1 |
Growing Power Demand | 128 | 1 |
Limiting dependence on Coal | 128 | 1 |
Ample Thorium Reserves | 129 | 1 |
International Deals will pave the Way for Development | 129 | 1 |
Steam Generators for Nuclear Power, India, Restraints | 130 | 1 |
Anti-Nuclear Public Opinion | 130 | 1 |
Nuclear Liability Laws | 130 | 1 |
Tariff Subsidies | 130 | 1 |
Steam Generators for Nuclear Power, India, Key Regulations, Authorities and Government Agencies | 130 | 1 |
Steam Generators for Nuclear Power, India, Key Regulations | 130 | 1 |
Steam Generators for Nuclear Power, India, Key Regulatory Authorities | 131 | 1 |
Steam Generators for Nuclear Power, India, Market Size Analysis, 2010 2025 | 132 | 1 |
Steam Generators for Nuclear Power, India, Market Size (units), 2010 2025 | 132 | 1 |
Steam Generators for Nuclear Power, India, Market Size ($m), 2010 2025 | 133 | 2 |
Steam Generators for Nuclear Power, India, Competitive Landscape | 135 | 2 |
Steam Generators for Nuclear Power, Japan | 137 | 1 |
Steam Generators for Nuclear Power, Japan, Capacity and Generation, 2010 2025 | 137 | 3 |
Steam Generators for Nuclear Power, Japan, Drivers | 140 | 1 |
Increasing Power Demand | 140 | 1 |
Rising Fuel Costs | 140 | 1 |
Need to Reduce Greenhouse Gas Emissions | 141 | 1 |
Expertise in Fuel Cycles | 141 | 1 |
Revamped Regulatory Structure | 141 | 1 |
Steam Generators for Nuclear Power, Japan, Restraints | 142 | 1 |
Adverse Environmental Conditions | 142 | 1 |
Lack of Domestic Uranium Resources | 142 | 1 |
Public Opinion and Protests | 142 | 1 |
Steam Generators for Nuclear Power, Japan, Key Regulations, Authorities and Government Agencies | 143 | 1 |
Steam Generators for Nuclear Power, Japan, Key Regulations | 143 | 1 |
Steam Generators for Nuclear Power, Japan, Key Regulatory Authorities | 144 | 1 |
Steam Generators for Nuclear Power, Japan, Market Size Analysis, 2010 2025 | 144 | 1 |
Steam Generators for Nuclear Power, Japan, Market Size (units), 2010 2025 | 145 | 1 |
Steam Generators for Nuclear Power, Japan, Market Size ($m), 2010 2025 | 146 | 1 |
Steam Generators for Nuclear Power, Japan, Competitive Landscape | 147 | 1 |
Steam Generators for Nuclear Power, South Korea | 147 | 1 |
Steam Generators for Nuclear Power, South Korea, Capacity and Generation, 2010 2025 | 147 | 3 |
Steam Generators for Nuclear Power, South Korea, Drivers | 150 | 1 |
Increased Power Demand | 150 | 1 |
Increasing the Share of Nuclear Power to Contribute to Limiting Carbon Emissions | 150 | 1 |
Dependency on Imported Fossil Fuel | 151 | 1 |
Cost advantages of nuclear power | 151 | 1 |
Steam Generators for Nuclear Power, South Korea, Restraints | 151 | 1 |
Lack of Uranium Reserves | 151 | 1 |
Reactor Malpractice | 151 | 1 |
Steam Generators for Nuclear Power, South Korea, Key Regulations, Authorities and Government Agencies | 152 | 1 |
Steam Generators for Nuclear Power, South Korea, Key Regulations | 152 | 1 |
Steam Generators for Nuclear Power, South Korea, Key Regulatory Authorities | 152 | 3 |
Steam Generators for Nuclear Power, South Korea, Market Size Analysis, 2010 2025 | 155 | 1 |
Steam Generators for Nuclear Power, South Korea, Market Size (units), 2010 2025 | 155 | 1 |
Steam Generators for Nuclear Power, South Korea, Market Size ($m), 2010 2025 | 156 | 1 |
Steam Generators for Nuclear Power, Competitive Landscape, South Korea | 157 | 3 |
Steam Generators for Nuclear Power, Emerging Nuclear Countries, 2010 2025 | 160 | 21 |
Introduction | 160 | 1 |
Steam Generators for Nuclear Power, Turkey | 161 | 1 |
Steam Generators for Nuclear Power, Turkey, Capacity and Generation, 2010 2025 | 161 | 4 |
Steam Generators for Nuclear Power, Turkey, Market Size Analysis, 2010 2025 | 165 | 1 |
Steam Generators for Nuclear Power, Turkey, Market Size (units), 2010 2025 | 165 | 1 |
Steam Generators for Nuclear Power, Turkey, Market Size ($m), 2010 2025 | 166 | 2 |
Steam Generators for Nuclear Power, UAE | 168 | 1 |
Steam Generators for Nuclear Power, UAE, Capacity and Generation, 2010 2025 | 168 | 4 |
Steam Generators for Nuclear Power, UAE, Market Size Analysis, 2010 2025 | 172 | 1 |
Steam Generators for Nuclear Power, UAE, Market Size (units), 2010 2025 | 172 | 1 |
Steam Generators for Nuclear Power, UAE, Market Size ($m), 2010 2025 | 173 | 1 |
Steam Generators for Nuclear Power, Vietnam | 174 | 1 |
Steam Generators for Nuclear Power, Vietnam, Capacity and Generation, 2010 2025 | 174 | 4 |
Steam Generators for Nuclear Power, Vietnam, Market Size Analysis, 2010 2025 | 178 | 1 |
Steam Generators for Nuclear Power, Vietnam, Market Size (units), 2010 2025 | 178 | 1 |
Steam Generators for Nuclear Power, Vietnam, Market Size ($m), 2010 2025 | 179 | 2 |
Steam Generators for Nuclear Power, Key Company Profiles | 181 | 7 |
Steam Generators for Nuclear Power, New Installed SG Units, 2010 2015, Above 1000 MW | 188 | 1 |
Appendix | 189 | 11 |
Abbreviations | 189 | 2 |
Bibliography | 191 | 4 |
Methodology and Forecasting | 195 | 3 |
Coverage | 195 | 1 |
Secondary Research | 195 | 1 |
Primary Research | 196 | 1 |
Modeling and Forecasting | 196 | 2 |
Disclaimer | 198 | 2 |