Title | Starting Page | Number of Pages |
---|
Table of Contents | 2 | 5 |
List of Tables | 6 | 1 |
Company Snapshot | 7 | 1 |
Key Information | 7 | 1 |
Company Overview | 7 | 1 |
SWOT Snapshot | 7 | 1 |
Operational Metrics | 8 | 1 |
Lanco Infratech Limited, Operational Metrics, By Capacity | 8 | 1 |
Lanco Infratech Limited, Operational Metrics, By Sales | 8 | 1 |
Lanco Infratech Limited, Wind Farms | 9 | 1 |
Lanco Infratech Limited, Wind Farms, India | 9 | 1 |
Lanco Infratech Limited, Solar PV Parks | 10 | 3 |
Lanco Infratech Limited, Solar PV Parks, India | 10 | 3 |
Lanco Infratech Limited, Solar Thermal Plants | 13 | 1 |
Lanco Infratech Limited, Solar Thermal Plants, India | 13 | 1 |
Lanco Infratech Limited, Hydro Power Plants | 14 | 1 |
Lanco Infratech Limited, Hydro Power Plants, Nepal | 14 | 1 |
Lanco Infratech Limited, Thermal Power Plants | 15 | 1 |
Lanco Infratech Limited, Thermal Power Plants, India | 15 | 1 |
Business Description | 16 | 1 |
Business Overview | 16 | 1 |
Major Products and Services | 17 | 1 |
History | 18 | 4 |
SWOT Analysis | 22 | 4 |
Overview | 22 | 1 |
Lanco Infratech Limited Strengths | 22 | 1 |
Operational performance | 22 | 1 |
Interest Coverage Ratio | 22 | 1 |
Energy Related Operations | 23 | 1 |
Diversified Service Offerings | 23 | 1 |
Lanco Infratech Limited Weaknesses | 23 | 1 |
Working capital Deficit | 23 | 1 |
Lanco Infratech Limited Opportunities | 23 | 1 |
Investments in Infrastructure Development: Global | 23 | 1 |
Renewable Energy Initiatives: India | 23 | 1 |
Positive Economic Conditions: India | 24 | 1 |
Increase in Demand for Electricity: India | 24 | 1 |
Lanco Infratech Limited Threats | 24 | 1 |
Operational Issues | 24 | 1 |
Environmental Laws and Regulations | 24 | 1 |
Lead Pollution | 24 | 1 |
Risks in Mining | 25 | 1 |
Financial Ratios - Capital Market Ratios | 26 | 1 |
Financial Ratios - Annual Ratios | 27 | 1 |
Financial Ratios - Interim Ratios | 28 | 1 |
Key Employees | 29 | 1 |
Key Employee Biographies | 30 | 1 |
Company Statement | 31 | 1 |
Locations And Subsidiaries | 32 | 2 |
Head Office | 32 | 1 |
Other Locations &Subsidiaries | 32 | 2 |
Financial Deals Landscape | 34 | 1 |
Lanco Infratech Limited, Deals Summary | 34 | 1 |
Lanco Infratech Limited, Power, Deal Details | 35 | 7 |
Asset Transactions | 35 | 1 |
Lanco Solar Energy Invests USD0.2 Million in Solar Power Plant at Biju Patnaik International Airport, Odisha, India | 35 | 1 |
Lanco Infratech To Invest US$2,562 Million In Raigarh Coal Power Project In Chattisgarh, India | 36 | 1 |
Lanco Infratech Announces Project Financing Of US$2 Billion For Phase II Of Anpara And Himawat Power Projects In India | 37 | 1 |
Lanco Infratech Announces Project Financing For Gas Fired Plant In Bangladesh | 38 | 1 |
LANCO Infratech Completes Project Financing Of US$1,223 Million For Vidarbha Coal Fired Power Plant In Maharashtra, India | 39 | 1 |
Asset Transactions | 40 | 1 |
Adani Power Completes Acquisition of Udupi Coal Fired Power Plant In Karnataka, India from Lanco Infratech for USD1 Billion | 40 | 1 |
Lanco Infratech To Sell Minority Stake In Coal Fired Power Plant In Chhattisgarh, India | 41 | 1 |
Recent Developments | 42 | 35 |
Lanco Infratech Limited - Recent Developments | 42 | 1 |
Feb 24, 2012: MEC Announces Update On International Competitive Bidding For Prai CCGT | 42 | 1 |
Apr 29, 2011: India To Announce Global Tenders For Five Mega Transmission Line Projects | 42 | 1 |
Jan 08, 2009: Tilaiya UMPP Developer To Be Selected On January 20, 2009 | 43 | 1 |
Mar 03, 2011: Lanco Vidarbha Receives Environmental Clearance To Set Up 1,320 MW Coal-Based Power Project In Maharashtra, India | 43 | 1 |
Apr 20, 2010: Uttar Pradesh State In India Gives Approval For Seven Thermal Power Plants | 43 | 1 |
Feb 20, 2009: Lanco Infratech Receives Approval For 1,320 MW Rajpura Thermal Power Project From Punjab Government | 43 | 1 |
Jul 11, 2008: Sterlite Energy Wins 2,000 MW Talwandi Sabo Thermal Power Project | 43 | 1 |
Apr 04, 2012: Lanco Infratech Announces Launch Of Two New Subsidiaries | 44 | 1 |
Feb 19, 2012: Lanco Infratech To Add 4 GW Additional Thermal Power Generation Capacity By March 2015 | 44 | 1 |
Dec 20, 2010: Lanco Infratech Plans To Produce 200-300MW Of Solar Thermal Power Over Next Two Years | 44 | 1 |
Sep 13, 2010: Lanco Plans To Set Up 720MW Combined Cycle Gas-Based Power Plant In Karnataka, India | 44 | 1 |
Apr 11, 2010: APTRANSCO Starts Negotiations To Receive Up To 50% Of Power From Expanded Capacities Of Seven IPPs In India | 45 | 1 |
Jan 07, 2010: Lanco Infratech To Enter Solar Power Business | 45 | 1 |
Aug 24, 2009: Lanco In Talks With PT Truba To Acquire South Sumatra Coal Mine | 45 | 1 |
Dec 30, 2008: Five Companies Bid For Tilaiya UMPP | 45 | 1 |
Jun 27, 2008: LANCO Plans To Set Up A Wind Turbine Unit In Pondicherry | 46 | 1 |
Apr 11, 2008: Lanco Wins Two Power Projects In Uttar Pradesh | 46 | 1 |
Feb 14, 2008: Lanco Plans To Setup Wind Turbine Facility In Mangalore | 46 | 1 |
Feb 12, 2013: Lanco Infratech Reports Revenue Of INR34.9 Billion In Q3 Fiscal 2013 | 46 | 1 |
Nov 09, 2012: Lanco Infratech Reports Revenue Of INR31.8 Billion In Q2 Fiscal 2013 | 47 | 1 |
Aug 13, 2012: Lanco Infratech Reports Revenue Of INR35 Billion In Q1 Fiscal 2013 | 47 | 1 |
May 29, 2012: Lanco Infratech Reports Revenue Of INR101.7 Billion In Fiscal 2012 | 47 | 1 |
Feb 13, 2012: Lanco Infratech Reports Revenue Of INR30.5 Billion In Q3 Fiscal 2012 | 48 | 1 |
Nov 11, 2011: LANCO Infratech Reports Q2 Fiscal 2012 Results | 48 | 1 |
Aug 13, 2011: LANCO Infratech Reports Q1 Fiscal 2012 Results | 48 | 1 |
May 29, 2011: LANCO Infratech Reports Fiscal 2011 Results | 48 | 1 |
Feb 07, 2011: LANCO Infratech Reports Q3 Fiscal 2011 Results | 48 | 1 |
Nov 11, 2010: LANCO Infratech Reports Net Profit Of INR902 Million For Q2 Fiscal 2011 | 48 | 1 |
May 31, 2010: LANCO Infratech Reports Operating Revenues Of INR94.57 Billion In Fiscal 2010 | 48 | 1 |
Jan 27, 2010: Lanco Infratech Reports Net Revenue Of INR16.1 Billion In Q3 Fiscal 2010 | 49 | 1 |
Oct 27, 2009: Lanco Infratech Reports Net Profit Of INR1.2 Billion In Q2 Fiscal 2010 | 49 | 1 |
Jul 29, 2009: Lanco Infratech Reports Net Profit Of INR1.1 Billion In Q1 Fiscal 2010 | 50 | 1 |
May 29, 2009: Lanco Reports Operating Revenues Of INR60.7 Billion In Fiscal 2009 | 50 | 1 |
Jan 30, 2009: Lanco Reports Q3 Fiscal 2009 Results | 51 | 1 |
Oct 31, 2008: Lanco Reports 1H Fiscal 2009 Results | 52 | 2 |
May 29, 2008: Lanco Reports Fiscal 2008 Results | 54 | 1 |
Jan 29, 2008: Lanco Declares Q3 Fiscal 2008 Results | 55 | 1 |
Oct 26, 2007: Lanco Declares Q2 Fiscal 2008 Results | 56 | 1 |
Jun 26, 2007: Lanco Declares Q1 Fiscal 2008 Results | 57 | 1 |
May 12, 2007: Lanco Declares Q4 Fiscal 2007 Results | 57 | 1 |
Dec 07, 2015: LANCO on path of realizing consolidated operating power capacity of around 8000 MW by FY2018 | 58 | 1 |
Jun 23, 2015: Lanco Infratech: Appointment of Directors | 58 | 1 |
May 12, 2015: Lanco, GVK Power, GMR applied for supply of imported gas for power stations | 58 | 1 |
Oct 11, 2014: India Ennore 1 660MW Supercritical BTG Project Launched | 58 | 1 |
Jun 12, 2014: Lanco Infratech s 1,200MW Udupi power plant stops operations | 59 | 1 |
Apr 23, 2014: 1MDB emerges as preferred bidder to acquire Lanco's 1,200MW coal-fired power project in India | 59 | 1 |
Oct 18, 2013: Cancellation of Letters of Intent (LOIs) issued to Lanco Infratech Ltd. for implementation of 2 x 300 MW Lignite based Expansion Power Project | 59 | 1 |
Aug 26, 2013: Lanco Tanjore Power Company awarded FIVE star Rating by British Safety Council | 59 | 1 |
Aug 20, 2013: Lanco Infratech plans to delay execution of some thermal power projects | 60 | 1 |
May 05, 2013: Lanco Infratech To Invest AUD1 Billion At Griffin Coal Mine In Australia | 60 | 1 |
Dec 05, 2012: APTransco Directs Lanco Infra And GMR To Go For Long Term PPAs To Supply Electricity To AP Discoms At Regulated Price | 60 | 1 |
Aug 20, 2012: India Gas Solutions To Supply LNG To Power Projects In Andhra Pradesh, India | 61 | 1 |
Jul 03, 2012: Uttar Pradesh Government In India To Allow 10 Power Projects To Import Coal | 61 | 1 |
Apr 17, 2012: Lanco Solar Completes Solar Photovoltaic Power Plants Totaling 56 MW Capacity In Gujarat, India | 61 | 1 |
Feb 21, 2012: Gas-fired Power Plants Running At Less Than 50% Of Installed Capacity In Andhra Pradesh, India: APTRANSCO | 62 | 1 |
Dec 21, 2011: Supreme Court Issues Stay Order On Further Proceedings In Lanco Amarkantak Case | 62 | 1 |
Nov 30, 2011: Lanco Power To Establish Coal-fired Power Project In Bhognipur, India | 62 | 1 |
Nov 29, 2011: Lanco Infratech Announces Management Changes | 62 | 1 |
Nov 05, 2011: Lanco Infratech Provides Update On PPA Of Korba Power Project In Chhattisgarh, India | 62 | 1 |
Jul 20, 2011: Indian Coal Ministry Warns Six Firms Of Rampia Coal Block Deallocation | 62 | 1 |
Jun 28, 2011: Lanco Solar Energy Plans To Invest INR17 Billion For Second Phase Of Solar PV Manufacturing SEZ Project In Chhattisgarh, India | 63 | 1 |
Mar 21, 2011: Lanco Anpara Power Synchronizes 600 MW Unit-I In India | 63 | 1 |
Mar 09, 2011: Udupi Power Synchronizes 600 MW Unit II With Grid | 63 | 1 |
Feb 10, 2011: Lanco Infratech And AREVA T&D Commission 765kV Transformer Bay And Unnao Line Bay | 63 | 1 |
Dec 31, 2010: Trina Solar Announces India Solar Power Plant Completion With Lanco Solar | 63 | 1 |
Nov 30, 2010: LANCO Infratech Declares Commercial Operations For 600MW Unit-1 Of Udupi Power | 64 | 1 |
Sep 24, 2010: Lanco Infratech Likely To Build Coal-Fired Mega Super-Critical TPPs In India | 64 | 1 |
Sep 13, 2010: Lanco To Develop Solar Photovoltaic Power Plants In Karnataka, India | 64 | 1 |
Aug 20, 2010: Lanco Infratech, Bukit Asam Collaborate To Bid For Developing 600MW Coal-Based Power Project In Indonesia | 64 | 1 |
Aug 16, 2010: Lanco Infratech To Invest INR240 Billion For Expansion Of Power Generation Capacity | 64 | 1 |
Aug 14, 2010: Lanco Infratech Appoints S. C. Manocha As Director Of Board | 65 | 1 |
Jul 05, 2010: PFC Postpones RFQ Bidding Deadline For 4,000MW Chhattisgarh UMPP In India | 65 | 1 |
Apr 11, 2010: Seven Gas-Fired IPPs In India Plan To Expand Combined Operational Capacity By 4,500MW | 65 | 1 |
Sep 11, 2009: India's Orissa To Start Connecting Renewable Power To Grid From 2011 | 65 | 1 |
Aug 28, 2009: India Approves Temporary Allocation Of RIL's KG-D6 Gas To Three Power Plants | 66 | 1 |
Feb 06, 2009: UP Power Projects Delayed | 66 | 1 |
Jan 20, 2009: Punjab Announces Affect In Investment In Thermal Plants With Financial Crisis | 66 | 1 |
Jan 20, 2009: Lanco s Subsidiary Commissions 5 MW Small Hydro Project In Himachal Pradesh | 67 | 1 |
Dec 18, 2008: Lanco Submits Financial Bid For Coal Based Rajpura Power Project At Punjab | 67 | 1 |
Apr 06, 2008: Lanco To Invest INR180 Billion By 2015 To Set Up Hydro Power Stations | 67 | 1 |
May 30, 2007: ABAN Registered As CDM Projects | 68 | 1 |
Oct 29, 2015: Receipt of LOIs worth Rs. 59.84 Cr.: Power Mech Projects Ltd | 68 | 1 |
Aug 01, 2014: DEC Signed India ENNORE 1 660MW Supercritical Coal-fired Power Plant Project Contract | 68 | 1 |
Feb 28, 2014: Lanco becomes the successful bidder of 1 x 660 MW Supercritical Ennore Thermal Power Station Expansion Project - EPC Contract | 68 | 1 |
Jul 31, 2013: Lanco Infratech To Develop Tasta Open Cast Project And Power Plant In Jharkhand, India | 68 | 1 |
Jun 03, 2013: Lanco Infratech Secures EPC Contracts From GIPCL For 600 MW Lignite-based Power Project In India | 69 | 1 |
Jan 29, 2013: Pennar Industries Receives Orders For Solar Power Equipment | 69 | 1 |
Dec 03, 2012: Lanco Infratech To Supply 300 MW Power To Distribution Companies In Madhya Pradesh, India | 69 | 1 |
Dec 14, 2011: Petron Engineering Receives Orders From Lanco Infratech For Dhenkanal Thermal Power Project In Odisha, India | 69 | 1 |
Nov 30, 2011: GEI Industrial Wins INR403 Billion Worth Multiple Contract | 69 | 1 |
Nov 01, 2011: Siemens Receives Contract From Lanco Infratech For 100 MW Solar Thermal Plant In India | 69 | 1 |
Aug 03, 2011: Lanco Infratech Bags Maha Tamil Project | 70 | 1 |
Jun 21, 2011: Lanco Infratech Wins EPC Order For AKAZ Power Plant In Iraq | 70 | 1 |
Jun 13, 2011: Baghdad Company Wins $130m Bid To Construct 500 MW Natural-Gas Fueled Power Project In Haidariya, Iraq | 70 | 1 |
May 26, 2011: Lanco Solar Receives LoA From Mahagenco To Build 75 MW Solar PV Project In Maharashtra, India | 71 | 1 |
Apr 12, 2011: Elecon Engineering Receives Order From Lanco Infratech For 1.3 GW Thermal Power Plant At Mandva India | 71 | 1 |
Apr 10, 2011: HHI Offers Lowest Bid Of $158.9m For Building 500 MW Gas-Fired Power Facility In Najaf, Central Iraq | 71 | 1 |
Apr 10, 2011: HHI, Lanco Infratech Submit Bids For Construction Of 250 MW Power Facility In Al-Qaim, Western Iraq | 71 | 1 |
Feb 02, 2011: Tecpro Systems Secures Two Coal Handling Plant Orders From Lanco Infratech | 71 | 1 |
Dec 21, 2010: Lanco Infratech Secures INR41 Billion EPC Contract From Moser Baer Projects For 2x600MW Power Project | 72 | 1 |
Dec 20, 2010: Lanco Infratech To Develop 5MW Solar PV Project And 100MW Solar Thermal Project In Rajasthan, India | 72 | 1 |
Dec 14, 2010: NVVN Selects 37 Companies Under First Phase Of JNNSM | 72 | 1 |
Nov 22, 2010: NVVN Selects Seven Bidders For Developing CSP Projects Totaling 479MW | 72 | 1 |
Oct 04, 2010: Alstom Wins INR550 Million Phatabyung Hydro Project Contract From Lanco Infratech | 73 | 1 |
Aug 29, 2010: Lanco Solar Wins Contract To Develop 80kWp Solar PV Power Unit At Indian Parliament | 73 | 1 |
Aug 06, 2010: Reliance, Punj Lloyd, Wipro Ecoenergy, Lanco And DD Solar23 Bid For Indian Parliament House Solar Power Project | 73 | 1 |
Jul 29, 2010: Lanco Infratech Secures BOP Contract From Mahagenco For Koradi Thermal Power Plant In India | 74 | 1 |
Jan 27, 2010: Lanco Infratech Wins INR4.54 Billion Non-EPC Contract From Lanco Mahanadi Power | 74 | 1 |
Jan 21, 2010: Lanco Infratech Enters MoU To Establish 1,980 MW Coal-Fired Power Plants In Uttar Pradesh, India | 74 | 1 |
Jan 15, 2010: UPPCL And UP State Government Enter Into Two MOU's For Generation Of 2400 MW Power | 74 | 1 |
Jul 10, 2009: Alstom to install hydro power plant in India | 74 | 1 |
Jul 10, 2009: Alstom Receives Contract From Lanco Infratech To Install New Hydro Power Plant In India | 74 | 1 |
Feb 19, 2009: AREVA T&D India Wins Contract For 765kV Substation Order From Lanco Infratech | 75 | 1 |
Jan 29, 2009: RPL Wins 4,300 MW Tilaiya UMPP In Jharkhand | 75 | 1 |
Jan 06, 2009: UPPCIL Financial Bidding Date Extended To January 19, 2009 | 75 | 1 |
Apr 30, 2008: LANCO Awards INR3.03 Billion Teesta Hydro Electric Power Project Contract | 76 | 1 |
Appendix | 77 | 1 |
Report Scope | 77 | 1 |
GlobalData Coverage | 77 | 1 |
Benchmarking | 77 | 1 |
GlobalData s Methodology | 77 | 1 |
Secondary Research | 77 | 1 |
Primary Research | 77 | 1 |
Contact Us | 78 | 1 |
Disclaimer | 78 | 1 |