Sections
| Title | Starting Page | Number of Pages |
|---|
| Table of Contents | 2 | 11 |
| List of Tables | 12 | 1 |
| Company Snapshot | 13 | 1 |
| Key Information | 13 | 1 |
| Company Overview | 13 | 1 |
| SWOT Snapshot | 13 | 1 |
| Operational Metrics | 14 | 2 |
| Chubu Electric Power Co., Inc., Operational Metrics, By Capacity | 14 | 1 |
| Chubu Electric Power Co., Inc., Operational Metrics, By Generation | 14 | 1 |
| Chubu Electric Power Co., Inc., Operational Metrics, By Transmission | 14 | 1 |
| Chubu Electric Power Co., Inc., Operational Metrics, By Distribution | 14 | 1 |
| Chubu Electric Power Co., Inc., Operational Metrics, By Customers | 14 | 1 |
| Chubu Electric Power Co., Inc., Operational Metrics, By Segmental Information | 15 | 1 |
| Chubu Electric Power Co., Inc., Wind Farms | 16 | 2 |
| Chubu Electric Power Co., Inc., Wind Farms, Thailand | 16 | 2 |
| Chubu Electric Power Co., Inc., Solar PV Parks | 18 | 3 |
| Chubu Electric Power Co., Inc., Solar PV Parks, Japan | 18 | 3 |
| Chubu Electric Power Co., Inc., Hydro Power Plants | 21 | 5 |
| Chubu Electric Power Co., Inc., Hydro Power Plants, Japan | 21 | 5 |
| Chubu Electric Power Co., Inc., Thermal Power Plants | 26 | 3 |
| Chubu Electric Power Co., Inc., Thermal Power Plants, Japan | 26 | 3 |
| Business Description | 29 | 1 |
| Business Overview | 29 | 1 |
| Major Products and Services | 29 | 1 |
| History | 30 | 9 |
| SWOT Analysis | 39 | 4 |
| Overview | 39 | 1 |
| Chubu Electric Power Co., Inc. Strengths | 39 | 1 |
| Established Presence in Energy Markets | 39 | 1 |
| Cost Efficiency | 39 | 1 |
| Research and Development Activities | 39 | 1 |
| Chubu Electric Power Co., Inc. Weaknesses | 40 | 1 |
| Business Performance: Electric Power | 40 | 1 |
| Working Capital Deficit | 40 | 1 |
| Chubu Electric Power Co., Inc. Opportunities | 41 | 1 |
| Growing Demand for Electricity | 41 | 1 |
| Developing Renewable Resources | 41 | 1 |
| Strategic Initiatives | 41 | 1 |
| Positive Outlook For Thermal Power: Japan | 41 | 1 |
| Chubu Electric Power Co., Inc. Threats | 41 | 1 |
| Volatility in Commodity Pricing | 41 | 1 |
| Seasonal Variations and Climate Conditions | 42 | 1 |
| Stringent Regulations | 42 | 1 |
| Transmission and Distribution Network Security | 42 | 1 |
| Financial Ratios - Capital Market Ratios | 43 | 1 |
| Financial Ratios - Annual Ratios | 44 | 1 |
| Financial Ratios - Interim Ratios | 45 | 1 |
| Key Employees | 46 | 1 |
| Key Employee Biographies | 47 | 1 |
| Company Statement | 48 | 1 |
| Locations And Subsidiaries | 49 | 2 |
| Head Office | 49 | 1 |
| Other Locations &Subsidiaries | 49 | 2 |
| Financial Deals Landscape | 51 | 2 |
| Chubu Electric Power Co., Inc., Deals Summary | 51 | 2 |
| Chubu Electric Power Co., Inc., Power, Deal Details | 53 | 20 |
| Asset Transactions | 53 | 1 |
| Chubu Electric Power And Tyr Energy To Acquire Stake In Five Natural-Gas Fired Power Plants From Tenaska | 53 | 2 |
| Consortium of Five Companies Complete Project Financing of USD488 Million for Carroll County Energy Project in Ohio, US | 55 | 1 |
| Consortium Of Seven Companies Complete Project Financing For Tahara Solar/Wind Electricity Generation Cooperative Operation in Tahara, Japan | 56 | 1 |
| Mitsubishi And C-Tech Announce Project Financing Of US$176 Million For Tahara Solar Power Plant In Japan | 57 | 1 |
| Partnerships | 58 | 1 |
| Venti-Japan, Mitsubishi Corporation Power and C-TECH Form Joint Venture to Develop Wind Farm in Northern Japan | 58 | 1 |
| Tokyo Electric Power to Form Joint Venture with Chubu Electric Power | 59 | 1 |
| Japanese Companies Form Joint Venture | 60 | 3 |
| Debt Offering | 63 | 1 |
| Chubu Electric Power Raises USD170.7 Million in Public Offering of 0.605% Bonds Due 2026 | 63 | 1 |
| Chubu Electric Power Announces Public Offering Of 1.194% Bonds Due 2023 For US$202.7 Million | 64 | 1 |
| Chubu Electric Power Completes Public Offering Of 497th Corporate Bonds For US$245.9 Million | 65 | 1 |
| Chubu Electric Power Completes Public Offering Of 496th Corporate Bonds For US$228.1 Million | 66 | 1 |
| Chubu Electric Power Completes Public Offering Of 495th Corporate Bonds For US$324.3 Million | 67 | 1 |
| Chubu Electric Power Completes Public Offering Of 494th Corporate Bonds For US$215.1 Million | 68 | 1 |
| Acquisition | 69 | 1 |
| Chubu Electric Power To Acquire 80% Stake In Diamond Power From Mitsubishi | 69 | 1 |
| Gunkul Engineering Public Company To Sell 49% Interest In Gunkul Powergen Company To Chubu Electric Power For US$ Million | 70 | 1 |
| Chubu Electric Acquires 47.6% Stake In Tac Energy | 71 | 1 |
| Chubu Electric Power And Tohoku Electric Power Acquires 30% Stake In MT Falcon Holdings From Mitsui | 72 | 1 |
| Recent Developments | 73 | 126 |
| Chubu Electric Power Co., Inc. - Recent Developments | 73 | 1 |
| Jul 27, 2016: Joint implementation of a feasibility study of the offshore wind farm project at Akita Port and Noshiro Port in Akita Prefecture | 73 | 1 |
| Jun 24, 2016: Jointly Implementing an Operation Support Service for Thermal Power Generation | 73 | 1 |
| Sep 28, 2015: New initiatives directed toward the full deregulation of electric power | 73 | 2 |
| Apr 15, 2015: Establishment of JERA - Creation of a global energy company competing worldwide | 75 | 1 |
| Apr 14, 2015: Conclusion of Technical Cooperation Agreement with the Nuclear Damage Compensation and Decommissioning Facilitation Corporation | 75 | 1 |
| Mar 24, 2014: GAIL Executes MoU With Chubu Electric Of Japan For Joint LNG Procurement | 76 | 1 |
| Jan 28, 2013: Mitsubishi And C-Tech Sign Agreement With Aichi Public Enterprise Bureau To Develop Solar Power Project In Tahara, Japan | 76 | 1 |
| Dec 21, 2012: Chubu Electric Announces Integration Of Thai Subsidiary And Bangkok Office | 76 | 1 |
| Aug 13, 2012: Meralco PowerGen And Chubu Electric To Conduct Study On Impact Of Planned LNG Project In Atimonan, Philippines | 77 | 1 |
| Mar 27, 2012: Chubu Electric Announces Operating Objectives For Fiscal Year 2012 | 77 | 1 |
| May 09, 2011: Chubu Electric Consortium Plans For Shale Gas Development In Canada | 77 | 1 |
| Feb 24, 2011: Chubu Electric Announces Determination Of Chubu Electric Power Group Management Vision 2030 | 78 | 1 |
| Dec 17, 2010: Shizuoka City And Chubu Electric Conclude Agreement For Construction Of Mega-Solar Power Facility In Japan | 78 | 1 |
| Sep 14, 2010: Chubu Electric To Construct Gas-Fired Combined-Cycle Power Plant At Its Nishinagoya Facility In Japan | 78 | 1 |
| Jul 06, 2010: Japanese Consortium Establishes New Office For International Nuclear Energy Development of Japan | 79 | 1 |
| Feb 24, 2010: Chubu Electric And Iida City Sign Agreement For Joint Construction Of Mega-Solar Power Facility In Iida City, Nagano Prefecture | 79 | 1 |
| Jun 01, 2009: Chubu Electric Asks Japanese Government Permission To Replace Two Nuclear Reactors At Hamaoka Nuclear Power Station | 79 | 1 |
| Dec 22, 2008: Chubu To Construct Dry Storage Facility Inside Hamaoka Nuclear Power For Spent Fuel | 80 | 1 |
| Jul 23, 2012: Chevron Discovers Gas At Pontus-1 Exploration Well In Greater Gorgon Area Offshore Western Australia | 80 | 1 |
| Apr 25, 2014: Chubu Electric Power: FY2013 Second Half Electric Power Sales Results | 80 | 1 |
| Apr 26, 2013: Chubu Electric Reports Revenue Of JPY2.6 Trillion In Fiscal 2013 | 81 | 1 |
| Jan 31, 2013: Chubu Electric Reports Revenue Of JPY2 Trillion For Nine Months Ended December 31, 2012 | 81 | 1 |
| Oct 31, 2012: Chubu Electric Reports Revenue Of JPY1.3 Trillion In H1 Fiscal 2013 | 81 | 1 |
| Jul 30, 2012: Chubu Electric Reports Revenue Of JPY629.5 Billion In Q1 Fiscal 2013 | 81 | 1 |
| Apr 27, 2012: Chubu Electric Reports Revenue Of JPY2.4 Trillion In Fiscal 2012 | 82 | 1 |
| Apr 27, 2012: Chubu Electric Reports Revenue Of JPY2.4 Trillion In Fiscal 2012 | 82 | 1 |
| Jan 31, 2012: Chubu Electric Reports Revenue Of JPY1.7 Trillion For Nine Months Ended December 31, 2011 | 82 | 1 |
| Oct 28, 2011: Chubu Electric Reports Revenue Of JPY1.2 Trillion In H1 Fiscal 2012 | 82 | 1 |
| Jul 29, 2011: Chubu Electric Reports Operating Revenues Of JPY539.3 Billion In Q1 Fiscal 2012 | 82 | 1 |
| Apr 28, 2011: Chubu Electric Reports Operating Revenue Of JPY2.3 Trillion In Fiscal Year Ended 2011 | 82 | 1 |
| Oct 29, 2010: Chubu Electric Reports Operating Revenues Of JPY1.15 Trillion For H1 Fiscal 2011 | 82 | 1 |
| Jul 30, 2010: Chubu Electric Reports Operating Revenues Of JPY526.39 Billion For Q1 Fiscal 2011 | 82 | 1 |
| Apr 28, 2010: Chubu Electric Reports Operating Revenues Of JPY2.23 Trillion For Fiscal 2010 | 82 | 1 |
| Oct 30, 2009: Chubu Electric Reports Net Income Of JPY90.6 Billion In H1 Fiscal 2010 | 83 | 1 |
| Apr 28, 2009: Chubu Electric Reports JPY2,510 Billion Operating Revenues In Fiscal 2009 | 83 | 2 |
| Jul 31, 2008: Chubu Electric Reports 1Q Fiscal 2009 Results | 85 | 1 |
| Apr 28, 2008: Chubu Electric Reports Fiscal 2008 Results | 85 | 2 |
| Oct 31, 2007: Chubu Electric Reports H1 Fiscal 2008 Results | 87 | 1 |
| Jul 31, 2007: Chubu Electric Reports Q1 Fiscal 2008 Results | 88 | 1 |
| Apr 27, 2007: Chubu Electric Reports Fiscal 2007 Results | 89 | 2 |
| Jan 31, 2007: Chubu Electric Reports Nine Months Fiscal 2007 Results | 91 | 1 |
| Oct 31, 2006: Chubu Electric Reports H1 Fiscal 2007 Results | 91 | 1 |
| Sep 23, 2016: Chubu Electric and INPEX to Begin Wholesale Electricity Supply to Three City Gas Companies in Saitama and Nagano Prefectures in Japan | 92 | 1 |
| Sep 06, 2016: Wood Group And Technip Complete Gorgon Work | 92 | 1 |
| Aug 29, 2016: Hekinan Thermal Power Station Achieves 200 Million-Ton Mark in its Cumulative Coal Reception | 93 | 1 |
| Aug 25, 2016: Technical Evaluation Results Concerning Hamaoka Nuclear Power Station Unit 3 s Aging State | 93 | 1 |
| Jul 31, 2016: Chevron Provides Update On Production At Gorgon LNG Facility's Train 1 | 93 | 1 |
| Jul 29, 2016: Enhanced Safety Measures at Hamaoka Nuclear Power Station: Chubu Electric Power | 94 | 1 |
| Jul 27, 2016: Chevron To Ship Third LNG Cargo From Gorgon Facility In Australia | 95 | 1 |
| Jul 23, 2016: Chevron Takes Gorgon LNG Facility Back Online | 95 | 1 |
| Jul 20, 2016: Chevron May Take Gorgon LNG Project Back Online Shortly | 95 | 1 |
| Jul 12, 2016: Chevron's Production At Gorgon LNG Plant Still On Hold | 96 | 1 |
| Jul 05, 2016: Chevron Exports Second Cargo From Gorgon LNG Terminal | 96 | 1 |
| Jul 04, 2016: Australia's Ichthys LNG Project Sees Installation Of Two Tank Platforms | 97 | 1 |
| Jul 01, 2016: Chevron Takes Gorgon LNG Facility Offline In Australia | 97 | 1 |
| Jun 29, 2016: Commercial Operation Begins at Nyukawa Hydroelectric Power Station | 97 | 1 |
| Jun 23, 2016: Permanent Countermeasure Work Completed for the Fracture in Joetsu Thermal Power Station s Steam Turbine Moving Vane | 98 | 1 |
| Jun 16, 2016: Causes of Omaezaki Wind Power Station Unit 4 Blade Breakage | 98 | 1 |
| May 31, 2016: Chevron Secures Environmental Permit For Gorgon LNG Project Train 4 | 98 | 1 |
| May 27, 2016: Commission Received for the project for capacity development of power transmission and distribution system in Republic of the Union of Myanmar Phase 1 | 99 | 1 |
| May 26, 2016: Change of the FY2016 new fuel transportation schedule for Hamaoka Nuclear Power Station | 99 | 1 |
| Apr 27, 2016: FY2015 Electric Power Sales Results | 99 | 1 |
| Apr 27, 2016: FY2015 Second Half Electric Power Sales Results | 100 | 1 |
| Apr 11, 2016: Government Of British Columbia: Japan Trip Strengthens B.C. s Natural Gas Prospects | 100 | 1 |
| Apr 11, 2016: Chevron Celebrates A New Chapter In Australia s Resource History | 101 | 1 |
| Apr 04, 2016: Delivery of 10 neo RiSe Land-mounted Flap Gate Seawalls to Hamaoka Nuclear Power Station | 102 | 1 |
| Mar 31, 2016: Chubu Electric builds seawall to protect Hamaoka nuclear complex in Japan | 102 | 1 |
| Mar 31, 2016: Japan Asia Investment finishes 2MW Ise Kashiwa Nishinono solar power project | 102 | 1 |
| Mar 31, 2016: The Decommissioning of Taketoyo Thermal Power Plant Units 2-4 | 103 | 1 |
| Mar 29, 2016: Start of Commercial Operation of Lat Krabang Cogeneration Power Plant in Thailand: Chubu Electric Power | 103 | 1 |
| Mar 24, 2016: Commercial Operation Begins at all Tokuyama Hydroelectric Power Station Units | 103 | 1 |
| Mar 23, 2016: Japan's Nagoya Port To Receive Qatari LNG Cargo | 103 | 1 |
| Mar 20, 2016: Chevron: First Chevron Gorgon LNG Cargo Departs For Japan | 104 | 1 |
| Mar 14, 2016: Government of Australia: Gorgon LNG Project Produces First Shipment | 104 | 1 |
| Feb 02, 2016: Chubu Electric secures approval for decommissioning of Hamaoka nuclear units | 105 | 1 |
| Jan 15, 2016: Chevron Australia Announces Gorgon Commissioning Milestone | 105 | 1 |
| Jan 12, 2016: New Rate Menus in the Chubu Electric Power Area for the Full Retail Deregulation of Electric Power | 106 | 1 |
| Jan 07, 2016: Chubu Electric reports fire broke out at Hamaoka nuclear power plant in Japan | 106 | 1 |
| Dec 01, 2015: Kawasaki Kisen Kaisha: New LNG Carrier For Chubu Electric Named BISHU MARU | 106 | 1 |
| Nov 05, 2015: INPEX-Operated Ichthys LNG Project Completes Offshore Pipelay | 107 | 1 |
| Oct 28, 2015: FY2015 First-half Electric Power Sales Results: Chubu Electric Power | 108 | 1 |
| Oct 25, 2015: Qatargas Delivers 2,300 LNG Cargoes To Japan Since 1997 | 108 | 1 |
| Oct 13, 2015: Antero Resources Announces Third Quarter 2015 Operations Update | 109 | 1 |
| Sep 25, 2015: Change of Scheduled Start of Commercial Operation at Tokuyama Hydroelectric Power Station Unit 1 | 110 | 1 |
| Sep 08, 2015: Japan's Nagoya Port To Receive Qatari LNG | 111 | 1 |
| Sep 08, 2015: Pulse Undertaking Pipeline Monitoring On The Chevron-Operated Gorgon Project | 111 | 1 |
| Sep 02, 2015: Development of Hybrid SHS: a Hybrid Superheated Steam Generator Combining Electricity and Gas -offers Both Reduced Power Consumption and Accurate Temperature Control | 111 | 1 |
| Aug 27, 2015: Commission Received for Survey to Confirm and Collect Information on the Southern African Power Pool (SAPP) | 112 | 1 |
| Aug 17, 2015: Nuclear Safety: Delivery of Venting Systems in Japan | 112 | 1 |
| Aug 02, 2015: Mitsubishi: First Shipment Of LNG From Donggi-Senoro Project In Indonesia | 112 | 1 |
| Jul 31, 2015: Application for Approval on Wheeling Service Provisions | 113 | 1 |
| Jul 07, 2015: Atagi Hydroelectric Power Station Starts Commercial Operation | 114 | 1 |
| Jun 26, 2015: Operation of the 5th low-level radioactive waste transport this fiscal year | 114 | 1 |
| Jun 23, 2015: NRA starts safety assessment at Hamaoka No. 3 nuclear reactor in Japan | 114 | 1 |
| Jun 22, 2015: Change of Scheduled Start of Commercial Operation at Tokuyama Hydroelectric Power Station Unit 1 | 114 | 1 |
| Jun 16, 2015: Chubu Electric files application for safety screening of No. 3 reactor at Hamaoka NPP | 114 | 1 |
| Jun 16, 2015: Shin-Kuhshihara Hydroelectric Power Station Starts Commercial Operation | 115 | 1 |
| Jun 08, 2015: Japan's Chita LNG Terminal Receives 3,500th Cargo From Qatar | 115 | 1 |
| Jun 02, 2015: Starting an Overseas Energy-Saving Support Service | 115 | 1 |
| Apr 28, 2015: Freeport LNG Closes Financing and Commences Construction of Third Natural Gas Liquefaction Train | 116 | 1 |
| Apr 28, 2015: Chubu Electric Power: FY2015 Operating Objectives | 117 | 1 |
| Apr 27, 2015: Results of Selection of Proposals for Nuclear Power-related Research based on Public Call for Submissions (Research start on FY2015) | 117 | 1 |
| Apr 27, 2015: Chubu Electric Power: FY2014 Second Half Electric Power Sales Results | 117 | 1 |
| Apr 27, 2015: Chubu Electric Power: FY2014 Electric Power Sales Results | 118 | 1 |
| Apr 10, 2015: March 2015, FY2014 (2nd half) and FY2014 (Entire) Power Generated and Purchased (Preliminary Report) | 118 | 1 |
| Mar 16, 2015: Hamaoka Nuclear Power Station Units No. 1 and 2 Application for Approval of Changes to the Decommissioning Plan | 118 | 1 |
| Mar 11, 2015: Chubu Electric plans to build biomass power plant in Japan | 119 | 1 |
| Mar 11, 2015: Transportation (Return) of New Fuel from Hamaoka Nuclear Power Station Reactor No. 2 Completed | 119 | 1 |
| Feb 06, 2015: Plans for Development of Taketoyo Thermal Power Plant Unit 5 | 120 | 1 |
| Jan 27, 2015: Chubu Electric submits application to construct dry storage facility at Hamaoka NPP | 120 | 1 |
| Jan 26, 2015: Regarding the License Application for Changes to Power Reactor Facilities for the Construction of the Spent Fuel Dry Storage Facility at Hamaoka Nuclear Power Station | 120 | 1 |
| Jan 20, 2015: Chevron And SK LNG Trading Sign Gorgon LNG Supply Agreement | 120 | 1 |
| Dec 18, 2014: Tepco And Chubu Electric Jointly Invite Bids For LNG Supply | 121 | 1 |
| Dec 01, 2014: Planned development of Shin-Okuizumi hydroelectric power station | 121 | 1 |
| Nov 26, 2014: Regarding the International Contributions Utilizing Decommissioned Hamaoka Nuclear Power Station Unit 1 | 121 | 1 |
| Nov 14, 2014: Commission Received for Preparatory Survey for Power Distribution Network Improvement Project in Major Regional Cities of Myanmar | 122 | 1 |
| Nov 11, 2014: Agreement with Bonneville Power Administration, U.S. Department of Energy to Conduct Demonstration Project for Grid Stabilization | 122 | 1 |
| Nov 06, 2014: Chubu Electric To Purchase LNG At Spot Rates From GDF Suez | 123 | 1 |
| Oct 31, 2014: Partial Revision of Work to be Performed for Enhanced Safety Measures related to Hamaoka Nuclear Power Station | 123 | 1 |
| Oct 30, 2014: Chubu Electric Power: Final Investment Decision And Execution Of Loan Agreements For Freeport LNG Project In U.S. | 124 | 1 |
| Oct 30, 2014: Osaka Gas : Freeport LNG project Updates | 124 | 1 |
| Oct 29, 2014: Pavilion Energy plans joint procurement of LNG with Chubu Electric Power | 124 | 1 |
| Oct 29, 2014: Freeport LNG Executes Definitive Agreements For Debt Financing Of First Natural Gas Liquefaction Train | 124 | 1 |
| Oct 14, 2014: Japan's Chita Terminal To Receive LNG Cargo From Qatar | 125 | 1 |
| Oct 08, 2014: September 2014 and FY2014 1st Half Power Generated and Purchased (Preliminary Report): Chubu Electric Power | 125 | 1 |
| Oct 07, 2014: TEPCO and Chubu Electric to form comprehensive alliance- Creation of a global energy company competing worldwide | 126 | 1 |
| Oct 03, 2014: Situation of Inspection related to Seawater Infiltration Event at Hamaoka Nuclear Power Station Unit 5 | 127 | 1 |
| Sep 05, 2014: New LNG Vessel for Chubu Electric Power Named | 128 | 1 |
| Aug 18, 2014: Qatar Exports LNG Cargo To Japan's Chita Terminal | 128 | 1 |
| Jun 20, 2014: Chubu Electric Power: Shipment of Low-level Radioactive Waste | 128 | 1 |
| Jun 18, 2014: Chubu Electric's investigation reveals no active faults at Hamaoka nuclear site | 128 | 1 |
| Jun 02, 2014: ONE Energy Commences Storage Battery Rentals within Areas Served by Chubu and Kansai Electric Power | 129 | 1 |
| May 29, 2014: Chubu Electric Power: Start of Construction for the Shin-Kuhshihara Hydroelectric Power Station | 129 | 1 |
| May 29, 2014: Chubu Electric Power: Start of Construction for the Shin-Kuhshihara Hydroelectric Power Station | 129 | 1 |
| May 15, 2014: Chubu Electric Power: Joetsu Thermal Power Station Starts General Operations | 129 | 1 |
| May 15, 2014: Tokuyama Hydroelectric Power Station Unit 2 Starts Commercial Operation | 130 | 1 |
| May 01, 2014: Chubu Electric Power: Start of Construction for the Atagi Hydroelectric Power Station | 130 | 1 |
| Apr 28, 2014: Chubu Electric Power Announces Operating Objectives for FY2014 | 130 | 1 |
| Apr 24, 2014: Itron to Participate in Major Japanese Smart Metering Deployment | 131 | 1 |
| Apr 18, 2014: Chubu Electric Power :Approval for electricity rates increase | 131 | 1 |
| Apr 11, 2014: Chubu Electric receives permit to increase household electricity prices | 131 | 1 |
| Apr 02, 2014: Electric Power Trading Business (PPS) to Commence Operations within Chubu Electric Service Area | 132 | 1 |
| Mar 25, 2014: Chubu Electric to announce tender for constructing new fossil-fuel power plant | 132 | 1 |
| Feb 14, 2014: Chubu Electric files safety assessment of Unit 4 at Hamaoka nuclear plant | 132 | 1 |
| Feb 06, 2014: Chubu Electric to submit application for safety inspection at Hamaoka 4 nuclear reactor | 133 | 1 |
| Dec 20, 2013: Chubu Electric To Obtain LNG Spot Cargo From Nigeria | 133 | 1 |
| Dec 02, 2013: Concerning the results of tsunami deposit study on premises and in vicinity of the Hamaoka Nuclear Power Station | 133 | 1 |
| Nov 18, 2013: Completion of work of the 275 kV Suruga Higashi-Shimizu line and the Higashi-Shimizu transformer substation | 133 | 1 |
| Oct 29, 2013: Concerning Increase of Electricity Rates | 134 | 1 |
| Oct 01, 2013: Electric Power Supply and Demand Results for Summer FY2013 | 134 | 1 |
| Sep 25, 2013: Implementation of Additional Safety Measures for Hamaoka Nuclear Power Station Units 3 and 4 in accordance with New Regulatory Requirements | 134 | 1 |
| Jul 05, 2013: Results for CO2 Emission Intensities per Unit of Electric Power (FY2008-2012) | 135 | 1 |
| Jun 27, 2013: Commencement of Installation of Filter Vent Equipment in Hamaoka Nuclear Power Station Unit 3 | 136 | 1 |
| Jun 27, 2013: Efforts to Respond to New Standards at Hamaoka Nuclear Power Station | 136 | 1 |
| Jun 21, 2013: Mega Solar Power Generation Plants in Thailand All Start Commercial Operation | 137 | 1 |
| Jun 21, 2013: Commissioned to Conduct a "Preparatory Survey for a Project to Improve Electric Power Facilities in the Yangon Urban Area of Myanmar" | 137 | 1 |
| Jun 14, 2013: Chubu Electric Begins Installation Of Filter Vent Equipment At Hamaoka Nuclear Power Station Unit 4 | 138 | 1 |
| Apr 26, 2013: Chubu Electric Conducts Evaluation Of Effects On Equipment And Facilities To Maintain Safety In Units 2 5 Of Hamaoka NPS | 138 | 1 |
| Mar 18, 2013: Chubu Electric Completes Installation Of Additional LNG Tanks At Kawagoe TPS In Japan | 139 | 1 |
| Mar 09, 2013: JAPC To Receive Financial Assistance Of JPY140 Billion | 140 | 1 |
| Mar 08, 2013: JNFL Announces Receipt Of Low-level Radioactive Waste From Hamaoka Nuclear Power Station In Japan | 140 | 1 |
| Mar 01, 2013: Chubu Electric To Transport Low-level Rradioactive Waste At Hamaoka Nuclear Power Station | 140 | 1 |
| Feb 15, 2013: Chubu Electric Begins Operations At Higashi Shimizu Frequency Converter | 140 | 1 |
| Jan 25, 2013: Ichthys LNG Project To Achieve First Gas By 2016: Inpex | 140 | 1 |
| Dec 20, 2012: Chubu Electric Announces Reinforcement Of Tsunami Countermeasures At Hamaoka Nuclear Power Station In Japan | 141 | 2 |
| Dec 20, 2012: Chubu Electric Announces Implementation Of Severe Accident Countermeasures | 143 | 1 |
| Dec 18, 2012: Ichthys LNG Project Completes Project Financing Arrangements: Inpex | 143 | 1 |
| Dec 05, 2012: Japan To Receive Radioactive Waste From UK By February 2014 | 144 | 1 |
| Nov 20, 2012: Chubu Electric May Delay Restart Of No. 5 Reactor At Hamaoka Nuclear Power Plant | 144 | 1 |
| Nov 05, 2012: TEPCO To Issue Tender For New Baseload Power Suppliers | 144 | 1 |
| Oct 31, 2012: Chubu Electric Provides Updates On Fuel Consumption For Fiscal 2013 | 145 | 1 |