The Electricity Generating Authority of Thailand (EGAT) plans to build six new coal-fired power plants by ---- in a bid to improve its share of the power supply market from -- to -- . The six new plants are expected to have a combined capacity of -,---MW. ...The largest source of growth in ---- will be thermal generation, while non-hydropower renewables will be the fastest growing sub-sector at --.- . Meanwhile, the Thai power sector s long-term growth outlook is muted, as the country continues to experience challenges in procuring gas supplies and is clearly moving towards increasing reliance on electricity imports. We see electricity generation growing at an average rate of -.- per annum between ---------. ...
...(USD-.--bn) first elevated train project will connect Kaerai and Min Buri, while the THB--.-bn (USD-.--bn) second project will connect Lat Phrao and Samrong. ...The preferred bidder will be required to operate and maintain the extension. The other two projects are the THB-.--bn (USD---mn) Nonthaburi waste-to-energy project and the THB-.--bn (USD--mn) Nakhon Ratchasima waste-to-energy facility. � The Thai government updated its green energy agenda with the ambitious Alternative Energy Development Plan (---------). The plan states -- of total energy consumption must be derived from alternative energy sources by ----. It targets - gigawatts (GW) of solar capacity, -.-GW of wind capacity and -.--GW of biomass capacity within that timeframe.
...BMI View: Thailand s plan to reduce its reliance on gas-fired power generation will create opportunities for alternatives such as coal and renewables, which poses upside risks to our outlook for the country s energy related infrastructure. That said, the scale of upside risk has been limited somewhat following the announcement that EPAC has approved the construction of a new LNG import terminal at Rayong. ...That said, the scale of upside risk has been limited somewhat following the announcement that EPAC has approved the construction of a new LNG import terminal at Rayong. We highlight that lower than expected power consumption over the near term means such opportunities will begin to have an impact on infrastructure construction only beyond --------- as projects are delayed until demand picks up. We retain a modest growth forecast for ---- and ----, with power generation set to grow by -.- and -.- , respectively. ...